Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07364
Well Classification: OW Status: PR - 8/30/2021
Well Name/No:State of Colorado #3-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:S8369.5
Facility Status:PRStatus Date8/30/2021
FacilityID:455025LocationID:455024
County:ARAPAHOE #005Location:NWNW 33 5S64W 6
Field:BRAVE - #7515Elevation:6067 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:600FNL  720 FWLLat/Long: 39.577973 / -104.564748Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.577980 / -104.564730Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2021
End Date: 3/29/2021
Reported: 4/20/2021
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/30/2021             Measured TD: 8655 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/30/2021
Wellbore Permit
Permit #: Expiration Date:5/15/2020
Proposed Depth/Form:8650 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2450 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 1025, Top: 0 ft., Bottom: 2450 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8650 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7250 ft., Bottom: 8650 ft.

Wellbore Completed
Completion Date:10/4/2018
Spud Date:9/18/2018Spud Date Is:ACTUAL
Measured TD:8655 ft.Measured PB depth:8630 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CDL/CNL, RES, CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 73 ft., Weight: 36.95 , Citings Type: ACTUAL
Cement:Sacks: 56, Top: 0 ft., Bottom: 73 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2463 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 0 ft., Bottom: 2463 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8650 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6920 ft., Bottom: 8650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5398 ft.
NIOBRARA7722 ft.
FORT HAYS8042 ft.
X BENTONITE8344 ft.
D SAND8432 ft.
J SAND8484 ft.

Formation JSND                     Formation Classification:  OW                     Status:  PR - 8/30/2021                 Interval Top: 8521 ft.    Interval Bottom: 8545 ft.

 Completed Information for Formation J SAND
1st Production Date:10/8/2018Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/29/2021Treatment End Date:3/29/2021
Treatment Summary:Fracture stimulated J Sand Formation with 1979 barrels (132 barrels flush) 30# crosslinked borate gel containing 5,280# 100 mesh sand and 161,880 20/40 sand at 32 BPM and 3551 psi average pressure. Maximum pressure was 3891 psi. ISIP - 2355 psi. 5 min - 2163 psi. 10 min - 1983 psi. 15 min - 1860 psi. Upon placement of the J Sand stimulation treatment a composite bridge plug was set at 8510' and the D Sand was perforated and fracture stimulated. The BP was later drilled out and the D Sand and J Sand were commingled.
Total fluid used in treatment (bbls):1979Max pressure during treatment (psi):3891
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):1979Disposition method For flowback:DISPOSAL
Total proppant used (lbs):167160Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/9/2018Treatment End Date:N/A
Treatment Summary:No formation treatment performed. Fracture stimulation will occur once gas sales for the well is determined.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 6
BTU_GAS 1400
CALC_BBLS_H2O 2
CALC_BBLS_OIL 6
CALC_GOR 1500
CALC_MCF_GAS 9
CASING_PRESS 80
GRAVITY_OIL 40
MCF_GAS 9
Perforation Data:
Interval Top:8521 ft.# Of Holes:48
Interval Bottom:8545 ft.Hole Size:0.41 in.

Formation DJSND                   Formation Classification:  OW                   Status:  CM - 6/23/2021                 Interval Top: 8440 ft.    Interval Bottom: 8545 ft.

 Completed Information for Formation D & J SAND
1st Production Date:4/15/2021Choke Size: 
Formation Name:D & J SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:8583 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/2021Test Method:Pumping
Hours Tested:24Gas Type:WET
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 19
BTU_GAS 1355
CALC_BBLS_H2O 40
CALC_BBLS_OIL 19
CALC_GOR 263
CALC_MCF_GAS 5
CASING_PRESS 160
GRAVITY_OIL 36
MCF_GAS 5
TUBING_PRESS 15
Perforation Data:
Interval Top:8440 ft.# Of Holes:79
Interval Bottom:8545 ft.Hole Size:0.41 in.

Formation DSND                     Formation Classification:  OW                     Status:  PR - 10/25/2021                Interval Top: 8440 ft.    Interval Bottom: 8476 ft.

 Completed Information for Formation D SAND
1st Production Date:4/6/2021Choke Size: 
Formation Name:D SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/29/2021Treatment End Date:3/29/2021
Treatment Summary:The D Sand Formation was perforated from 8440'-8445' with 4SPF and 8461'-8476' with 1 SPF after placement of composite bridge plug at 8510'. Fracture stimulated D Sand Formation with 1182 barrels 30# crosslinked borate gel containing 5,280# 100 mesh sand and 51,000# 20/40 sand at 31 BPM and average pressure of 4680 psi. Due to a operational situation at surface very little flush was pumped. This caused a substancial amount of 20/40 sand to be left in the casing to have to be circulated out after shut down. It is estimated that 15,000# of the 20/40 sand was left in the casing never making it into formation. Approximately 36,000# of 20/40 sand made it into formation. The ISIP as well as other end of job pressures are meaningless. D Sand Formation has been commingled with the J Sand and the well has been placed on production.
Total fluid used in treatment (bbls):1182Max pressure during treatment (psi):5348
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):1182Disposition method For flowback:DISPOSAL
Total proppant used (lbs):56280Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DSND.
Perforation Data:
Interval Top:8440 ft.# Of Holes:35
Interval Bottom:8476 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1270
Total Gas Produced (MCF)10679
GOR8408
GOR DeterminationBOE
Average BOE per Day8.524
Average MCFE per Day49.441

 Federal Financial Assurance  i 

 Tribal Well  i No