| UIC | Form: (04) 402246858 11/22/2019 | If Sealmaker sealant fails to repair the well and the well cannot pass an MIT then the tubing and packer must be removed and replaced as needed. If the well still fails to pass an MIT it should be plugged and abandoned. Operator has until December 6, 2019 to pass an MIT. |