Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-06089
Well Classification: ERIW Status: SI - 7/1/2024
Well Name/No:PEORIA J-SAND UNIT #27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TYLER ROCKIES EXPLORATION LTD - 41550
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2024
FacilityID:204006LocationID:320625
County:ARAPAHOE #005Location:SWSE 29 4S60W 6
Field:PEORIA - #68350Elevation:5241 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FELLat/Long: 39.668937 / -104.123375Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.669030 / -104.123280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: SI - 7/1/2024             Measured TD: 6642 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        SI - 7/1/2024
Wellbore Permit
Permit #:19700422 Expiration Date:8/27/1971
Proposed Depth/Form:6615 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: S2SE

Wellbore Completed
Completion Date:N/A
Spud Date:9/1/1970Spud Date Is:ACTUAL
Measured TD:6642 ft.Measured PB depth:6595 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:IES, FDC DENSITY CALIPER, CORRELATION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 175 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 175 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6642 ft., Weight: 14 & 15.5, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 5312 ft., Bottom: 6642 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 1794 ft., Bottom: 1868 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 136, Top: 692 ft., Bottom: 808 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
D SAND6460 ft.N
J SAND6535 ft.N

Formation JSND                     Formation Classification:  ERIW                     Status:  SI - 7/1/2024                  Interval Top: 6540 ft.    Interval Bottom: 6572 ft.

 Completed Information for Formation J SAND
1st Production Date:9/13/1970Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:INJECTION
Open Hole Completion:
Formation Treatment
Treatment Date:9/25/1970
Treatment Summary:SEE SCANNED DOCUMENT # 00412314
Tubing Size:2.875 in.Tubing Setting Depth:6550 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/25/1970Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_OIL 1600
CASING_PRESS 1300
MCF_GAS 1207
TUBING_PRESS 285
Perforation Data:
Interval Top:6540 ft.# Of Holes:32
Interval Bottom:6572 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
06/30/2024
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No