TypeSource DocumentConditions of Approval
PermitForm: (02)
400525148
01/08/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
PermitForm: (02)
400525148
01/15/2014
Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013.
EngineerForm: (02)
400525148
01/26/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
PermitForm: (02)
400635520
06/30/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
PermitForm: (02)
400635520
06/30/2014
Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16- 2013.
EngineerForm: (04)
400658943
09/18/2014
Provide gas analysis including H2S once available.
EngineerForm: (04)
400658943
09/18/2014
Flaring shall be done with an enclosed combustion device. Flaring beyond a two week period post flowback will require prior COGCC approval.
EngineerForm: (04)
400658943
09/18/2014
1) The flaring of natural gas shall be allowed in accordance with COGCC Rule 912 for the initial production test period. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring. 3) The operator is required to obtain and maintain any required air permits from CDPHE. 4) The flare volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
EngineerForm: (04)
401015574
10/17/2016
1) Flaring of natural gas shall comply with COGCC Rule 912. 2) The flaring of this well will be allowed until January 31, 2017. Submit requests to continue to flare prior to that date to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The expectation for permanent flares controlling separators will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. 6) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400525148
2/8/2014
Guy Line Anchors: Per the SUA, Ward will remove all guy line anchors for drilling and completions within 30 days upon termination of oil and gas operations by Ward.
PlanningForm: (02 )
400525148
2/8/2014
Development from existing well pads: Development from existing well pads was not an option for this well. However, this well pad will be considered for future well locations.
PlanningForm: (02 )
400525148
2/8/2014
Site Specific Measures: Ward will maintain a Stormwater Management Plan with site specific measurements to assess erosion control.
PlanningForm: (02 )
400525148
2/8/2014
Multiwell Pads: In order to reduce surface disturbance, Ward is permitting this 2A for five (5) wells.
Traffic controlForm: (02 )
400525148
2/8/2014
Traffic Plan: A traffic plan will be done if required by Adams County.
Traffic controlForm: (02 )
400525148
2/8/2014
Access Roads: Ward will utilize Highway and County roads as well as the agreed upon access road to the surface location per the SUA. Any required county permits will be obtains prior to use.
General HousekeepingForm: (02 )
400525148
2/8/2014
Loadlines: All loadlines shall be bullplugged or capped.
General HousekeepingForm: (02 )
400525148
2/8/2014
Removal of Surface Trash: Per the SUA, Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
General HousekeepingForm: (02 )
400525148
2/8/2014
Well Site Cleared: Per the SUA, Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
Material Handling and Spill PreventionForm: (02 )
400525148
2/8/2014
Leak Detection Plan: To ensure protection for the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. Should any spill or release occur, every reasonable step will be taken to quickly remediate the area disturbed.
Material Handling and Spill PreventionForm: (02 )
400525148
2/8/2014
Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead(s), tanks and separator(s).
ConstructionForm: (02 )
400525148
2/8/2014
Berm Construction: A containment berm will be constructed around the oil and water storage tanks. The berm will be inspected regularly and maintained in good condition.
ConstructionForm: (02 )
400525148
2/8/2014
Fencing: Per the SUA, during drilling operations the well sites and any pits shall be fenced of required by the Owner.
Noise mitigationForm: (02 )
400525148
2/8/2014
Noise: No noise mitigation will required for this location.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
Closed Loop System: Closed Loop System will be used for drilling and fluid management. No reserve pit will be used.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
Green Completions: Ward will comply with COGCC Rule 805b.(3)A and utilize Green Completion Methods.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
BOPE Testing: Upon initial rig-up and once every 30 days during drilling operations, pressure testing of the casing string and each component of the BOPE will be performed to 70% of working pressure or 70% of the internal yield of the casing, whichever is less.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
BOPE for well servicing operations: Adequate blowout prevention equipment will be used on any servicing operations associated with this well. Backup staving valves shall be required on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure and high-pressure fluid.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
BOPE: Ward will utilize drilling rigs with a minumum of a double ram and annular preventer.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
Drill Stem Tests: Drill Stem Tests are not anticipated for this location.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day for issues. Recorded inspections will be conducted once a month pursuant to 40 CFR §112.
Drilling/Completion OperationsForm: (02 )
400525148
2/8/2014
Pit Level Indicators: Pit Level Indicators will not be needed as no pits will be used on location.
Final ReclamationForm: (02 )
400525148
2/8/2014
Identification of Plugged and Abandoned Wells: Pursuant to Rule 319.a.(5)., once the well has been plugged and abandoned, Ward will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.
PlanningForm: (02 )
400635520
6/30/2014
Guy Line Anchors: Per the SUA, Ward will remove all guy line anchors for drilling and completions within 30 days upon termination of oil and gas operations by Ward.
PlanningForm: (02 )
400635520
6/30/2014
Developement from existing well pads: Developement from existing well pads was not an option for this well. However, this well pad will be considered for future well locations.
12