Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09801
Well Classification: OW Status: PR - 7/1/2019
Well Name/No:Sharp #24-3-11HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2019
FacilityID:436060LocationID:436062
County:ADAMS #001Location:SWSW 24 1S67W 6
Field:WATTENBERG - #90750Elevation:5019 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FSL  190 FWLLat/Long: 39.944030 / -104.846050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944030 / -104.846050Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/7/2015
End Date: 1/10/2015
Reported: 2/20/2015
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/21/2015             Measured TD: 10239 ft.    Vertical TD: 7775 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/21/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/7/2016
Proposed Top PZ Location:Sec:24 Twp: 1S 67W Footage: 479 FSL  878 FWL
Bottom Hole Location:Sec:24 Twp: 1S 67W Footage: 479 FSL  878 FWL
Proposed Depth/Form:12507 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 586, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8146 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 819, Top: 3000 ft., Bottom: 8146 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7206 ft., Depth: 12507 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/29/2014
Spud Date:6/9/2014Spud Date Is:ACTUAL
Measured TD:10239 ft.Measured PB depth:8638 ft.
True Vertical TD:7775 ft.True Vertical PB depth:7779 ft.
Bottom Hole Location:Sec:24 Twp: 1S 67WFootage: 479 FSL  878 FWL
Log Types:High Resolution Induction.pdf; Compensated Density, Neutron.pdf; Gama-Ray, Mudlog.pdf; Cement Bond Log.pdf. Induction, Density, Neutron.LAS
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1235 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 592, Top: 0 ft., Bottom: 1235 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8243 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 734, Top: 970 ft., Bottom: 8243 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 8243 ft., Depth: 10239 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4923 ft.4970 ft.
NIOBRARA7384 ft.7848 ft.
CODELL8127 ft.8239 ft.
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 7/1/2019             Measured TD: 12582 ft.    Vertical TD: 7757 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 7/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/29/2016
Proposed Top PZ Location:Sec:24 Twp: 1S 67W Footage: 479 FSL  878 FWL
Bottom Hole Location:Sec:24 Twp: 1S 67W Footage: 465 FNL  873 FWL
Proposed Depth/Form:12507 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1037 , Unit Acreage: 640, Drill Unit: S. 24: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1235 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 586, Top: 0 ft., Bottom: 1235 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8243 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 819, Top: 3000 ft., Bottom: 8243 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7206 ft., Depth: 12507 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/6/2014
Spud Date:6/9/2014Spud Date Is:ACTUAL
Measured TD:12582 ft.Measured PB depth:12574 ft.
True Vertical TD:7757 ft.True Vertical PB depth:7757 ft.
Top PZ Location:Sec:24 Twp: 1S 67WFootage: 479 FSL  878 FWL
Bottom Hole Location:Sec:24 Twp: 1S 67WFootage: 465 FNL  873 FWL
Log Types:CBL, MWD; Mud Log
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1235 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 592, Top: 0 ft., Bottom: 1235 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8243 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 734, Top: 970 ft., Bottom: 8243 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: , Top: 7032 ft., Depth: 12578 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 7032 ft., Bottom: 12578 ft., Determination Method: CBL

Formation CODL                     Formation Classification:  OW                     Status:  PR - 7/1/2019                  Interval Top: 8250 ft.    Interval Bottom: 12526 ft.

 Completed Information for Formation CODELL
1st Production Date:1/13/2015Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/7/2015Treatment End Date:1/10/2015
Treatment Summary:20 stages: 24 bbl 15% HCL acid; 3,098,039 gal XL, 108,409 gal linear, 281,610 gal linear flush; Placed 2,983,200# 30/50 and 1,245,700# 20/40 InterProp @ AR 57.1 BPM
Total fluid used in treatment (bbls):87799Max pressure during treatment (psi):7894
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7787
Fresh water used in treatment (bbls):87775Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3915700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 351
BBLS_OIL 578
BTU_GAS 1750
CALC_BBLS_H2O 351
CALC_BBLS_OIL 578
CALC_GOR 1031
CALC_MCF_GAS 596
CASING_PRESS 1260
GRAVITY_OIL 33
MCF_GAS 596
Perforation Data:
Interval Top:8250 ft.# Of Holes:600
Interval Bottom:12526 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3876
Total Gas Produced (MCF)4918
GOR1268
GOR DeterminationBOE
Average BOE per Day12.949
Average MCFE per Day75.107

 Federal Financial Assurance  i 

 Tribal Well  i No