COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400226886
12/6/2011
1) Note surface casing setting depth change from 1050’ to 1140’. Increase cement coverage accordingly and cement to surface. 2) Provide 24 hour notice of MIRU to Mike Hickey at 970-302-1024 or e-mail at Mike.Hickey@state.co.us 3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200’ above Sussex. Verify coverage with cement bond log.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Site SpecificForm: (02 )
400226886
12/30/2011
Fence the well site after drilling to restrict public and wildlife access. Keep well site location, the road, and the pipeline easement free of noxious weeds, litter and debris. Spray for noxious weeds, and implement dust control, as needed. Operator will not permit the release or discharge of any toxic or hazardous chemicals or wastes on Owner’s Land. Construct and maintain gates where any roads used by operator, its employees, or contractors cross through fences on the leased premises.
Final ReclamationForm: (02 )
400226886
12/30/2011
All surface restoration shall be accomplished to the satisfaction of Owner. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner. Final reclamation shall be completed to the reasonable satisfaction of the Owner as soon as practical after installation (weather permitting) and in accordance with regulatory agency standards (BLM/COGCC).
Interim ReclamationForm: (02 )
400226886
12/30/2011
Utilize only such area around each producing well as is reasonably necessary. Restore the remainder of the well site location to its original condition within a reasonable time after the completion of operations. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner.
PlanningForm: (02 )
400226886
12/30/2011
When feasible develop multiple well sites by using directional drilling to reduce cumulative impacts and adverse impacts on wildlife resources.
Storm Water/Erosion ControlForm: (02 )
400226886
12/30/2011
Use water bars, and other measures to prevent erosion and non-source pollution. Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation. Co-locate gas and water gathering lines whenever feasible, and mitigate any erosion problems that arise due to the construction of any pipeline(s).
Drilling/Completion OperationsForm: (02 )
400226886
12/30/2011
When available and reasonable use a closed-loop drilling mud system to preclude the use of an earthen reserve pits when available.
ConstructionForm: (02 )
400226886
12/30/2011
Remove only the minimum amount of vegetation necessary for the construction of roads and facilities. Conserve topsoil during excavation and reuse as cover on disturbed areas to facilitate regrowth of vegetation. No construction or routine maintenance activities will be performed during periods when the soil is too wet to adequately support construction equipment.