|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2020 Measured TD: 5265 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2020 | Wellbore Permit | | Permit #: | | Expiration Date: | 12/29/2013 | Proposed Depth/Form: | 5250 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250-12 , Unit Acreage: 80, Drill Unit: E/2SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1140 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 735, Top: 0 ft., Bottom: 1140 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5250 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 677, Top: 1050 ft., Bottom: 5250 ft. |
| | |
Wellbore Completed | Completion Date: | 2/6/2012 | Spud Date: | 2/1/2012 | Spud Date Is: | ACTUAL | Measured TD: | 5265 ft. | Measured PB depth: | 5237 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Density, Neutron, Induction, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1199 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 880, Top: 0 ft., Bottom: 1199 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5254 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 1526 ft., Bottom: 5254 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3636 ft. | | N | N | SUSSEX | 4870 ft. | | N | N |
Formation SUSX Formation Classification: OW Status: PR - 1/1/2020 Interval Top: 5090 ft. Interval Bottom: 5124 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 9/30/2012 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/21/2012 | Treatment Summary: | 1 stage: Frac'd 3/21/12 with 19,358 gals FR, 1,052 MSCF nitrogen, 180,180 lbs 16/30 White Sand, 20,180 lbs 20/40 SLC
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/8/2012 | Test Method: | FLOWING | Hours Tested: | 25 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 15 | BTU_GAS | 1241 | CALC_BBLS_H2O | 14 | CALC_BBLS_OIL | 15 | CALC_GOR | 1000 | CALC_MCF_GAS | 15 | CASING_PRESS | 180 | GRAVITY_OIL | 40 | MCF_GAS | 15 |
| Perforation Data: | Interval Top: | 5090 ft. | # Of Holes: | 110 | Interval Bottom: | 5124 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 277 |
Total Gas Produced (MCF) | 500 |
GOR | 1805 |
GOR Determination | BOE |
Average BOE per Day | 0.988 |
Average MCFE per Day | 5.749 |
Federal Financial Assurance | i | |
|
|