Engineer | Form: (06 ) 401677632 8/26/2018 | Wellbore diagram submitted with Form 6, Subsequent Report of Abandonment must include cement coverage demonstrated by CBL, |
Engineer | Form: (06 ) 401677632 8/26/2018 | NOTE: Changes in plugging procedure. CBL to be run prior to plugging to verify stage tool setting depth and existing coverage - submit to COGCC for verification of plugging orders. Additional plugs required.
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Plug placed at 2500' shpould be tagged - 2400' or shallower. For 1365’ plug: pump plug and displace - tag plug – must be 1265’ or shallower. If surface casing shoe plug (480')is plug not circulated to surface (or does not remain at surface) then tag plug and provide 5 sx plug at the surface.
3) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
|