|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/7/2018 Measured TD: 8127 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/7/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19870570 | Expiration Date: | 12/18/1987 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 40, Drill Unit: NWNE |
| | |
| Wellbore Completed | | Completion Date: | 10/15/1987 | | Spud Date: | 8/19/1987 | Spud Date Is: | ACTUAL | | Measured TD: | 8127 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION SFL FORMATION DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 215 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8128 ft., Weight: 15.1 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7400 ft., Bottom: 8128 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1316 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1316 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4793 ft. | | | | | NIOBRARA | 7010 ft. | | | | | FORT HAYS | 7385 ft. | | | | | GREENHORN | 7490 ft. | | | | | BENTONITE | 7687 ft. | | | | | D SAND | 7784 ft. | | | | | J SAND | 7848 ft. | | | | | SKULL CREEK | 7914 ft. | | | | | DAKOTA | 8036 ft. | | | | | LAKOTA | 8094 ft. | | | | | MORRISON | 8115 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/7/2018 Interval Top: 7882 ft. Interval Bottom: 7909 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/15/1987 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/15/1987 | | Treatment Summary: | SEE SCANNED DOCUMENT #00304214 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7975 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/20/1987 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 27 | | CALC_GOR | 3222 | | MCF_GAS | 87 |
| | Perforation Data: | | Interval Top: | 7882 ft. | # Of Holes: | 30 | | Interval Bottom: | 7909 ft. | Hole Size: | |
|
Formation DSND Formation Classification: GW Status: AB - 10/7/2018 Interval Top: 7787 ft. Interval Bottom: 7798 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 10/15/1987 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/15/1987 | | Treatment Summary: | SEE SCANNED DOCUMENT #00304212 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/1988 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 7 | | CALC_GOR | 13571 | | GRAVITY_OIL | 40 | | MCF_GAS | 95 |
| | Perforation Data: | | Interval Top: | 7787 ft. | # Of Holes: | 11 | | Interval Bottom: | 7798 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/07/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|