SPILL OR RELEASE488277Moser Fed 3-21HZ Facility
KERR MCGEE OIL & GAS ONSHORE LP
47120
CL
5/1/2025
 
 
WELD  123
NENW 21 3N65W 6
336383View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:3/11/2025
Date Recv'd:3/11/2025Assigned by:Laurel Anderson
DocNum:404048046Facility ID: 488277
Document Type:FORM 27 Project Number:40167
Operator Information:
Operator:KERR MCGEE OIL & GAS ONSHORE LP
Oper. No.47120
Address:P O BOX 173779  DENVER  CO 80217-3779
Type Of Facility:SPILL OR RELEASE
Fac. NameMoser Fed 3-21HZ Facility
County Name:WELD
Operator contact:Jaron Bartoszek
qtrqtr: NENWsection: 21township: 3Nrange: 65Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
GROUNDWATER UTBD Groundwater Samples/Laboratory Analytical Results
SOILS YTBD Soil Samples/Laboratory Analytical Results
Reason for Report: SPILL
Cause of Condition: SPILL OR RELEASE
Potential Receptors: Agriculture approximately 450 ft southeast. No other potential receptors were identified within 1/4-
 
FURTHER SITE INV:  Assessment activities are ongoing and details will be provided in a subsequent Form 27 Supplemental report.
 
HOW REMEDIATE:  Laboratory data indicate that all confirmation samples were in compliance with Table 915-1 allowable levels or site-specific background levels for all requested analytes. Due to the SAR exceedance at sample location SS02@0.5', additional sample volume will be collected for the confirmation soil samples and will be analyzed for SAR to complete the waste profile. Groundwater was not encountered during excavation activities. Assessment activities are ongoing and details will be provided in a subsequent Form 27 Supplemental report.
 
INITIAL ACTION:  On October 15, 2024, approximately 140 bbls of produced water was released into secondary containment from a hole in a temporary water tank at the Moser Fed 3-21HZ facility. As such, a Form 19 Initial/Supplemental Spill/Release Report (Document No. 403957849) was submitted on October 18, 2024, and the ECMC issued Spill/Release Point ID 488277. On December 10, 2024, following removal of the temporary tanks, soil samples (SS01@0.5’ through SS04@0.5’) were collected from the release area and submitted for full list Table 915-1 constituents to determine if soil impacts were present. Analytical results indicated that total petroleum hydrocarbon (TPH), 1,2,4-trimethylbenzene, 1,3,5-trimethylbenzene (TMB), polycyclic aromatic hydrocarbon (PAH), sodium adsorption ratio (SAR), arsenic, copper, and selenium impacts exceeding the ECMC Table 915-1 allowable levels or site-specific background levels were present in the release area. The facility soil sample locations are depicted on Figure 1. The PID readings and soil sample results are summarized in Tables 1 and 2, respectively. Assessment activities are ongoing and details will be provided in a subsequent Form 27 Supplemental report.
 
RECLAMATION PLAN:  The site will be reclaimed in accordance with ECMC 1000 Series Reclamation Rules.
 
SOURCE REMOVED:  Impacted soil will be removed and transported to a licensed disposal facility. Final disposal information will be provided upon completion of excavation activities. Disposal records will be kept on file and available upon request. The excavation area will be backfilled and contoured to match pre-existing conditions.
 
Correspondence Log:
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Facility488277Moser Fed 3-21HZ Facility
40.217095/-104.669580