Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07946CHEVRON FEE
106X
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
11/3/2014
RANGELY
72370
RIO BLANCO  103
SENE 30 2N102W 6
315119View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:8/7/2007MIT Assigned By:HELGELAND, GARY
Date Recv'd:4/14/2008Facility ID: 150200
DocNum:1260679Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameCHEVRON FEE
Operator contact:DIAN  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:5-YEAR UIC TEST
Test Date:8/6/2007
Field Rep:
Approved Date:4/14/2008
Approved by:HELGELAND, GARY
Last Approved MIT:4/5/2007
Injection/Producing Formation Zones:WEBR
Perforation Interval:5671-6443
Open Hole Interval:NA
Bridge/Cement Plug Depth:
Tubing Size:2.875
Tubing Depth:5437
Top Packer Depth:5402'
Multiple Packers:N
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
No test data.
Channel TestTest Date
CBL 8/9/2007
TEMPERATURE SURVEY 8/9/2007
TRACER SURVEY 8/9/2007