| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/13/2023 | Treatment End Date: | 11/13/2023 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) WITH 15% HCL w/SOLVENT AND 110 BBLS OF WATER.
|
| Total fluid used in treatment (bbls): | 205 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/31/2014 | Treatment End Date: | 10/31/2014 |
| Treatment Summary: | PUMP 4000 GALLONS 15% HCL |
| Total fluid used in treatment (bbls): | 234 | Max pressure during treatment (psi): | 1700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 139 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/8/2010 |
| Treatment Summary: | ACID STIMULATION 06/08/2010 PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF COILED TUBING 6088 AT STARTING PRESSURE OF 950 PSI. |
| Formation Treatment |
| Treatment Date: | 4/4/1996 |
| Treatment Summary: | COVERT PRODUCING WELL TO INJECTION WELL = SAME FORMATION = NO NEW PERFERATIONS INJECTION WAITINGON APPROVAL OF COGCC FORM 33 |