Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06122UNION PACIFIC
55-17
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
2/19/2019
RANGELY
72370
RIO BLANCO  103
SESE 17 2N102W 6
314557View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:10/6/2011MIT Assigned By:KOEHLER, BOB
Date Recv'd:10/14/2011Facility ID: 150200
DocNum:1771528Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON USA INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameUNION PACIFIC
Operator contact:DIANE L.  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:VERIFICATION OF REPAIRS
Repair Type:TUBING/PACKER LEAK
Repair Desc:PLUG BACK OPEN HOLE TO ABOVE THE OIL/WATER CONTACT-REPLACE TUBING. FORM 5 SUBMITTED ONLINE DOC # 400210627-CBL SUBMITTED ONLINE AS ATTACHMENT.
Test Date:10/4/2011
Field Rep:
Approved Date:10/19/2011
Approved by:KOEHLER, BOB
Last Approved MIT:4/14/2010
Injection/Producing Formation Zones:WEBR
Perforation Interval:NA
Open Hole Interval:6327-6545
Bridge/Cement Plug Depth:NA
Tubing Size:2.875
Tubing Depth:6390
Top Packer Depth:6222
Multiple Packers:Y
 
Condition of approval:
OPEN HOLE PLUGGED BACK TO 6545' (PBTD). FORM 5 IN-PROCESS TO DATE.
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE
5 MIN CASE
CASE BEFORE0
FINAL CASE820
FINAL TUBE0
INITIAL TUBE0
LOSS OR GAIN0
START CASE820
Channel TestTest Date
CBL 9/26/2011