Form 21 | Related Doc | Date Submitted: | 8/14/2007 | MIT Assigned By: | KOEHLER, BOB | Date Recv'd: | 9/5/2007 | API number: | 05-103-06319 | DocNum: | 1618089 | Facility Status: | IJ | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 100 CHEVRON ROAD RANGELY CO 81468 | Type Of Facility: | WELL | Well Status: IJ | Well Name/No. | A. C. MCLAUGHLIN | Operator contact: | DIANE L PETERSON | Location: | | qtrqtr: NWNW | section: 14 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | ANNUAL UIC TEST | Test Date: | 8/10/2007 | Field Rep: | | Approved Date: | 9/5/2007 | Approved by: | KOEHLER, BOB | Last Approved MIT: | 8/4/1997 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 6604-6694 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 6548 | Top Packer Depth: | 6468 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | No test data. |
| No channel test. |
|
|
|
|
|