Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06319
Well Classification: ERIW Status: IJ - 7/2/2021
Well Name/No:A. C. MCLAUGHLIN #45
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D 032675
Facility Status:IJStatus Date7/2/2021
FacilityID:229228LocationID:397218
County:RIO BLANCO #103Location:NWNW 14 2N103W 6
Field:RANGELY - #72370Elevation:5511 ft.
Planned Location:660FNL  660 FWLLat/Long: 40.148395 / -108.930658Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.148536 / -108.930639Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OTH             Status: IJ - 7/2/2021             Measured TD: 6717 ft.    Vertical TD: 6717 ft.

 Wellbore Data for Original WellboreWellbore Classification: OTH        IJ - 7/2/2021
Wellbore Permit
Permit #:20062447 Expiration Date:7/19/2007
Prop Depth/Form:6700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBER S Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 48 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: , Depth: 740 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: , Depth: 6470 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: , Bottom:

Wellbore Completed
Completion Date:7/28/2007
Spud Date:3/7/2007Spud Date Is:ACTUAL
Measured TD:6717 ft.Measured PB depth:
True Vertical TD:6717 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 2N 103WFootage: 767 FNL  649 FWLDepth
Bottom Hole Location:Sec:14 Twp: 2N 103WFootage: 767 FNL  649 FWLDepth
Log Types:CEMENT BOND LOG; MULTI-SENSOR CALIPER
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 48 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 48 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 740 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 740 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6470 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: , Bottom: , Determination Method: CALC
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6470 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3030 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 2177 ft., Bottom: 3030 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: , Size: 7 in., Top: , Depth: 3100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 6704 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 6704 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3838 ft.NN
MORRISON3930 ft.NN
CURTIS4657 ft.NN
ENTRADA4765 ft.NN
CARMEL4907 ft.NN
CHINLE5590 ft.NN
SHINARUMP5710 ft.NN
MOENKOPI5784 ft.NN
NAVAJO5954 ft.NN
WEBER6476 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/2/2021                  Interval Top: 6604 ft.    Interval Bottom: 6694 ft.

 Completed Information for Formation WEBER
1st Production Date:9/6/2007Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/28/2021Treatment End Date:6/28/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2150
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/18/2020Treatment End Date:9/18/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS POTABLE WATER
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/4/2010
Treatment Summary:ACID STIMULATION 06/04/2010 PUMPED 4000 GALLONS OF 20% HCL IN TWO ZONES THROUGH COILED TUBING AT 6694 AND 6604 AT STARTING PRESSURE OF 2500 PSI.
Formation Treatment
Treatment Date:8/6/2007
Treatment Summary:ACIDIZE FORMATION WITH 4500 GALLONS 15% HCL WITH ADDITIVES
Tubing Size:2.875 in.Tubing Setting Depth:6548 ft.
Tubing Packer Depth:6465 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6604 ft.# Of Holes:180
Interval Bottom:6694 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)196837
GOR
GOR DeterminationMCFE
Average BOE per Day91.920
Average MCFE per Day533.145

 Federal Financial Assurance  i Y

 Tribal Well  i No