| 404245787 | Form 17 | 5/30/2025 | 6/18/2025 | PLUNGER LIFT | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 997 | 998 | No | -- | -- | Remediation follow up test. 2 PSI gas flow blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404000651 | Form 17 | 11/18/2024 | 11/20/2024 | | 58 | CONTINUOUS | GAS | 0 | NO FLOW | 2772 | 2771 | No | -- | -- | Post-Production within 60 days of first sales. 58 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |