Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51771
Well Classification: OW Status: PR - 11/25/2024
Well Name/No:George #05N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/25/2024
FacilityID:482662LocationID:482391
County:WELD #123Location:SWNE 21 4N64W 6
Field:WATTENBERG - #90750Elevation:4718 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1816FNL  2356 FELLat/Long: 40.300180 / -104.554750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.300190 / -104.554758Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/19/2024
End Date: 9/28/2024
Reported: 11/12/2024
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/25/2024             Measured TD: 18129 ft.    Vertical TD: 6763 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/25/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/4/2025
Proposed Top PZ Location:Sec:21 Twp: 4N 64W Footage: 981 FNL  218 FEL
Bottom Hole Location:Sec:20 Twp: 4N 64W Footage: 984 FNL  205 FWL
Proposed Depth/Form:17910 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3328 , Unit Acreage: 3770, Drill Unit: S.4: S2S2S2, S.5: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17910 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 2000 ft., Bottom: 17910 ft.

Wellbore Completed
Completion Date:3/20/2024
Spud Date:3/2/2024Spud Date Is:ACTUAL
Measured TD:18129 ft.Measured PB depth:18108 ft.
True Vertical TD:6763 ft.True Vertical PB depth:6763 ft.
Top PZ Location:Sec:21 Twp: 4N 64WFootage: 981 FNL  218 FEL
Bottom Hole Location:Sec:20 Twp: 4N 64WFootage: 984 FNL  205 FWL
Log Types:CBL, MWD/LWD, (IND in 123-29145, RES in 123-51778)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 1989 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 0 ft., Bottom: 1989 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18121 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3188, Top: 3440 ft., Bottom: 18121 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4018 ft.
SUSSEX4477 ft.
SHANNON5488 ft.
SHARON SPRINGS7516 ft.
NIOBRARA7609 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 3/1/2026                  Interval Top: 7997 ft.    Interval Bottom: 18084 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/14/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:9/19/2024Treatment End Date:9/28/2024
Treatment Summary:Niobrara completed with 228 bbls 28% HCL, 178,454 bbls slurry, 22,398 bbls recycled water, 10,186,195 lb 40/140 Sand.
Total fluid used in treatment (bbls):201080Max pressure during treatment (psi):8350
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):228Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):22398Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):178454Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10186195Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7811 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 404
BBLS_OIL 416
BTU_GAS 1220
CALC_BBLS_H2O 404
CALC_BBLS_OIL 416
CALC_GOR 2548
CALC_MCF_GAS 1060
CASING_PRESS 2557
GRAVITY_OIL 42
MCF_GAS 1060
TUBING_PRESS 1641
Perforation Data:
Interval Top:7997 ft.# Of Holes:900
Interval Bottom:18084 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)69204
Total Gas Produced (MCF)413735
GOR5978
GOR DeterminationBOE
Average BOE per Day386.150
Average MCFE per Day2239.671

 Federal Financial Assurance  i 

 Tribal Well  i No