| 404326516 | Form 17 | 8/20/2025 | 8/22/2025 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 717 | 716 | No | -- | -- | |
| Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 0 | | -- | 0 | | 1015 | 1044 | No | No | No | |
| Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 0 | | -- | 0 | | 998 | 999 | No | No | No | |
| 403246101 | Form 17 | 11/30/2022 | 12/1/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2547 | 2547 | No | -- | -- | Post Drilling bradenhead test. Casing pressure is residual from pre-completion production casing pressure test. |