Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51741
Well Classification: OW Status: PR - 5/27/2023
Well Name/No:Ruby East #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/27/2023
FacilityID:482528LocationID:482392
County:WELD #123Location:SENW 7 7N65W 6
Field:WATTENBERG - #90750Elevation:4924 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2438FNL  2429 FWLLat/Long: 40.590394 / -104.707103Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.590394 / -104.707103Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/5/2023
End Date: 3/2/2023
Reported: 4/17/2023
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/27/2023             Measured TD: 18055 ft.    Vertical TD: 7157 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/27/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2025
Proposed Top PZ Location:Sec:7 Twp: 7N 65W Footage: 940 FNL  470 FWL
Bottom Hole Location:Sec:8 Twp: 7N 65W Footage: 940 FNL  470 FEL
Proposed Depth/Form:18178 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 7, 8
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18178 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2506, Top: 2500 ft., Bottom: 18178 ft.

Wellbore Completed
Completion Date:9/19/2022
Spud Date:8/2/2022Spud Date Is:ACTUAL
Measured TD:18055 ft.Measured PB depth:18045 ft.
True Vertical TD:7157 ft.True Vertical PB depth:7157 ft.
Top PZ Location:Sec:7 Twp: 7N 65WFootage: 944 FNL  510 FWL
Bottom Hole Location:Sec:8 Twp: 7N 65WFootage: 939 FNL  446 FEL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-51747
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1562 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1562 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18045 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2850, Top: 890 ft., Bottom: 18045 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4339 ft.NN
SUSSEX4936 ft.NN
SHANNON5776 ft.NN
SHARON SPRINGS7910 ft.NN
NIOBRARA7940 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/27/2023                 Interval Top: 8330 ft.    Interval Bottom: 17946 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/5/2023Treatment End Date:3/2/2023
Treatment Summary:559,429 bbls total slickwater; 18,233,206 # sand total (200/mesh 2084466, 100/mesh 40/70 16148740 30/50); 5988 gals 15% HCL. Method used to determine flowback volume: individual separator meters.
Total fluid used in treatment (bbls):559429Max pressure during treatment (psi):9258
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1960
Fresh water used in treatment (bbls):559287Disposition method For flowback:DISPOSAL
Total proppant used (lbs):18233206Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7954 ft.
Tubing Packer Depth:7954 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1095
BBLS_OIL 34
BTU_GAS 1384
CALC_BBLS_H2O 1095
CALC_BBLS_OIL 34
CALC_GOR 559
CALC_MCF_GAS 19
GRAVITY_OIL 42
MCF_GAS 19
TUBING_PRESS 1972
Perforation Data:
Interval Top:8330 ft.# Of Holes:1323
Interval Bottom:17946 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14667
Total Gas Produced (MCF)73164
GOR4988
GOR DeterminationBOE
Average BOE per Day74.812
Average MCFE per Day433.920

 Federal Financial Assurance  i 

 Tribal Well  i No