Click for Specifics | Light | 4/17/2024 | 7/29/2024 | | 3 | | -- | 0 | | 379 | 379 | No | No | No | |
Click for Specifics | Light | 4/10/2023 | 5/15/2023 | Plunger Lift | 9 | | -- | 0 | | 601 | 607 | No | No | No | |
Click for Specifics | Light | 4/7/2022 | 5/16/2022 | Plunger Lift | 2 | | -- | 0 | | 736 | 740 | No | No | No | |
402687994 | Form 17 | 5/11/2021 | 5/18/2021 | FLOWING | 5 | DOWN TO 0 | GAS | 0 | NO FLOW | 760 | 762 | No | -- | -- | This integrity test was done at the request of the COGCC due to the 3 string wellbore designs. |
402419344 | Form 17 | 6/10/2020 | 6/11/2020 | FLOWING | 5 | DOWN TO 0 | -- | 0 | NO FLOW | 480 | 473 | No | -- | -- | |
402326540 | Form 17 | 2/26/2020 | 2/27/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |