403892968 | Form 17 | 8/14/2024 | 8/20/2024 | SHUT-IN | 170 | DOWN TO 0 | GAS | 0 | NO FLOW | 444 | 444 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403150437 |
403506566 | Form 17 | 8/17/2023 | 8/23/2023 | FLOWING | 146 | DOWN TO 0 | GAS | 0 | NO FLOW | 401 | 397 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403150437 |
403150424 | Form 17 | 8/24/2022 | 8/29/2022 | FLOWING | 128 | DOWN TO 0 | GAS | 0 | NO FLOW | 474 | 463 | Yes | Yes | -- | Mitigation Bradenhead Test
WBD attached
|
402769085 | Form 17 | 7/28/2021 | 8/5/2021 | FLOWING | 137 | DOWN TO 0 | GAS | 0 | NO FLOW | 480 | 470 | Yes | Yes | No | 137 psig initial surface casing pressure. Gas samples taken. |
402305346 | Form 17 | 1/8/2020 | 2/6/2020 | FLOWING | 121 | DOWN TO 0 | -- | 0 | NO FLOW | 714 | 714 | Yes | Yes | No | Annual. 121 psig initial surface casing pressure. Blew down to 0 psig within 5 minutes. Gas samples taken.
Crestone is submitting this form 17 test after the 10 day period due to the NTO operator guidance updated on 1/13/20 to submit "full" tests via eForms rather than the bulk upload tool and further verbal instructions given by the COGCC staff on 1/23/20 to Crestone that those performed prior to the guidance update would still be valid, if not submitted via eForm within the 10 day period.
|
Click for Specifics | Full | 1/8/2020 | 1/20/2020 | | 121 | Down To Zero | -- | 0 | No Flow | 714 | 714 | No | Y | N | |
401947110 | Form 17 | 2/11/2019 | 2/21/2019 | FLOWING | 1541 | CONTINUOUS | -- | 0 | NO FLOW | 1752 | 1754 | Yes | Yes | No | First Sales
|
401852425 | Form 17 | 11/26/2018 | 11/28/2018 | | 1155 | WHISPER | -- | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | pre Stim |