Click for Specifics | Full | 5/3/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 170 | 169 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 3/31/2023 | 4/10/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 283 | 278 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
Click for Specifics | Full | 11/11/2022 | 11/29/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 318 | 317 | No | None | None | |
402792798 | Form 17 | 8/20/2021 | 8/26/2021 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 266 | 267 | No | -- | -- | Test per NTO. BH dead. |
Click for Specifics | Light | 11/20/2020 | 12/3/2020 | Flowing | 0 | | -- | 0 | No Flow | 196 | 197 | No | No | No | Test per NTO Vaccum for 3 seconds at open, then dead. |
402153191 | Form 17 | 8/22/2019 | 8/22/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 653 | 653 | No | -- | -- | Test per NTO. BH dead |