Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44747
Well Classification: OW Status: PR - 11/1/2021
Well Name/No:Ritchey #26-1-20HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2021
FacilityID:450280LocationID:450193
County:WELD #123Location:NWNW 26 1N66W 6
Field:WATTENBERG - #90750Elevation:5154 ft.
Planned Location:548FNL  660 FWLLat/Long: 40.028053 / -104.751517Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.028053 / -104.751517Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/24/2017
End Date: 8/7/2017
Reported: 9/8/2017
Days to report: 32
Disclosure: Sidetrack #00
Start Date: 7/24/2017
End Date: 8/7/2017
Reported: 9/12/2017
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2021             Measured TD: 12406 ft.    Vertical TD: 7566 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/6/2019
Proposed Top PZ Location:Sec:26 Twp: 1N 66W Footage: 460 FNL  990 FWL
Bottom Hole Location:Sec:26 Twp: 1N 66W Footage: 460 FSL  990 FWL
Proposed Depth/Form:11999 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1952 , Unit Acreage: 320, Drill Unit: Sec 26: W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 509, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11999 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1533, Top: , Bottom: 11999 ft.

Wellbore Completed
Completion Date:7/6/2017
Spud Date:6/13/2017Spud Date Is:ACTUAL
Measured TD:12406 ft.Measured PB depth:12347 ft.
True Vertical TD:7566 ft.True Vertical PB depth:7566 ft.
Top PZ Location:Sec:26 Twp: 1N 66WFootage: 502 FNL  982 FWL
Bottom Hole Location:Sec:26 Twp: 1N 66WFootage: 360 FSL  990 FWL
Log Types:MWD/LWD, CBL (Resistivity in 123-44742)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1494 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 1494 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12394 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1555, Top: 0 ft., Bottom: 12394 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4463 ft.4633 ft.NN
SUSSEX4871 ft.5107 ft.NN
SHANNON5621 ft.5825 ft.NN
SHARON SPRINGS7253 ft.NN
NIOBRARA7379 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2021                 Interval Top: 7965 ft.    Interval Bottom: 12131 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/29/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/24/2017Treatment End Date:8/7/2017
Treatment Summary:750 bbls 15% HCl; 5,222,580 # 40/70 sand; 1,319,560# 30/50 sand; 172,129 bbls slickwater and gelled fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):172879Max pressure during treatment (psi):8593
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):750Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7253
Fresh water used in treatment (bbls):172129Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6542140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 347
BBLS_OIL 302
BTU_GAS 1375
CALC_BBLS_H2O 347
CALC_BBLS_OIL 302
CALC_GOR 930
CALC_MCF_GAS 281
CASING_PRESS 1150
GRAVITY_OIL 45
MCF_GAS 281
Perforation Data:
Interval Top:7965 ft.# Of Holes:750
Interval Bottom:12131 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)666
Total Gas Produced (MCF)11842
GOR17780
GOR DeterminationMCFE
Average BOE per Day7.363
Average MCFE per Day42.685

 Federal Financial Assurance  i 

 Tribal Well  i No