| 404590450 | Form 17 | 3/10/2026 | 3/23/2026 | PLUNGER LIFT | 22 | DOWN TO 0 | GAS | 0 | NO FLOW | 323 | 336 | No | -- | -- | Remediation follow up test. 22 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404111555 | Form 17 | 2/20/2025 | 2/28/2025 | SHUT-IN | 18 | CONTINUOUS | GAS | 0 | NO FLOW | 357 | 388 | No | -- | -- | Remediation follow up test. 18 PSI gas blew down to 0 PSI within six minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403722353 | Form 17 | 3/14/2024 | 3/18/2024 | PLUNGER LIFT | 54 | CONTINUOUS | GAS | TSTM | WHISPER | 262 | 261 | No | -- | -- | Annual test. 54 PSI gas flow blew down to almost 0 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/15/2023 | 3/27/2023 | | 16 | Down to Zero | -- | 0 | No Flow | 251 | 251 | No | None | None | Annual Test. 16 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 403216545 | Form 17 | 11/1/2022 | 11/2/2022 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 262 | 260 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly. |
| 402987304 | Form 17 | 3/15/2022 | 3/17/2022 | PLUNGER LIFT | 51 | DOWN TO 0 | GAS | 0 | NO FLOW | 280 | 280 | Yes | -- | -- | Annual Test, 51 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402816018 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 3 | DOWN TO 0 | GAS | 0 | NO FLOW | 308 | 310 | No | -- | -- | Abatement system follow up test, 3 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402789451 | Form 17 | 4/21/2021 | 8/24/2021 | PLUNGER LIFT | 19 | CONTINUOUS | GAS | 0 | NO FLOW | 351 | 351 | No | -- | -- | Annual Test, 19 PSI gas flow blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402425819 | Form 17 | 4/27/2020 | 6/18/2020 | | 0 | WHISPER | -- | 0 | WHISPER | 456 | 456 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402239414 | Form 17 | 11/7/2019 | 11/14/2019 | PLUNGER LIFT | 463 | CONTINUOUS | -- | 37 | GAS | 758 | 758 | Yes | Yes | -- | 463 PSI with continous gas flow for the entire 30 min test. 37 PSI at the end of the test. PDC has collected a gas sample and will submit results via form 43. PDC has submitted a remediation plan via sundry. |
| 401347304 | Form 17 | 7/2/2017 | 7/19/2017 | FLOWING | 305 | CONTINUOUS | -- | 0 | NO FLOW | 2092 | 2091 | No | -- | -- | Post Production test, intitial pressure 305 PSI bled down to 0 PSI no flow for duration of test |
| 401237013 | Form 17 | 2/22/2017 | 3/20/2017 | SHUT-IN | 700 | VAPOR | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |