|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2020 Measured TD: 15287 ft. Vertical TD: 6835 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/20/2018 | Prop Depth/Form: | 15285 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1400 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15285 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2035, Top: 0 ft., Bottom: 15285 ft. |
| | |
Wellbore Completed | Completion Date: | 1/4/2017 | Spud Date: | 12/26/2016 | Spud Date Is: | ACTUAL | Measured TD: | 15287 ft. | Measured PB depth: | 15242 ft. | True Vertical TD: | 6835 ft. | True Vertical PB depth: | 6837 ft. | Top PZ Location: | Sec:14 Twp: 5N 65W | Footage: 539 FNL 1464 FWL | Depth | Bottom Hole Location: | Sec:23 Twp: 5N 65W | Footage: 2659 FSL 1453 FWL | Depth | Log Types: | CBL, MWD (DIL in 123-12759) | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1544 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1544 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15257 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2291, Top: 150 ft., Bottom: 15257 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3682 ft. | | | | SUSSEX | 4535 ft. | | | | SHARON SPRINGS | 6780 ft. | | | | NIOBRARA | 6918 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2020 Interval Top: 7896 ft. Interval Bottom: 15190 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/2/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/3/2017 | Treatment End Date: | 4/19/2017 | Treatment Summary: | 43 Stage Plug and Perf, Perf'd from 7896-15079, 3 Toe Sleeves from 15097-15190
Total Fluid: 149,824 bbls
Gel Fluid: 92,407 bbls
Slickwater Fluid: 56,207 bbls
15% HCl Acid: 1,210 bbls
Total Proppant: 7,959,225 lbs
Silica Proppant: 7,959,225 lbs
Method for determining flowback: measuring flowback tank volumes | Total fluid used in treatment (bbls): | 149824 | Max pressure during treatment (psi): | 4721 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 43 | Total acid used in treatment (bbls): | 1210 | Min frac gradient (psi/ft): | 0.98 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 6738 | Fresh water used in treatment (bbls): | 148614 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 7959225 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 745 | BBLS_OIL | 232 | BTU_GAS | 1285 | CALC_BBLS_H2O | 745 | CALC_BBLS_OIL | 232 | CALC_GOR | 4344 | CALC_MCF_GAS | 1008 | CASING_PRESS | 2843 | GRAVITY_OIL | 50 | MCF_GAS | 1008 | TUBING_PRESS | 1957 |
| Perforation Data: | Interval Top: | 7896 ft. | # Of Holes: | 2040 | Interval Bottom: | 15190 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 7130 |
Total Gas Produced (MCF) | 108346 |
GOR | 15195 |
GOR Determination | MCFE |
Average BOE per Day | 70.486 |
Average MCFE per Day | 408.806 |
Federal Financial Assurance | i | |
|
|