| Click for Specifics | Light | 3/21/2025 | 3/31/2025 | | 4 | | -- | 0 | | 385 | 385 | No | No | No | |
| Click for Specifics | Full | 7/15/2024 | 7/29/2024 | | 11 | Continuous | -- | 0 | Down to Zero | 227 | 232 | No | No | No | Annual Test. 11 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403309931 | Form 17 | 2/1/2023 | 2/2/2023 | SHUT-IN | 7 | DOWN TO 0 | GAS | 0 | NO FLOW | 381 | 381 | No | -- | -- | Abatement system follow up test. 7 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403260590 | Form 17 | 12/9/2022 | 12/14/2022 | PLUNGER LIFT | 8 | DOWN TO 0 | GAS | 0 | NO FLOW | 214 | 219 | No | -- | -- | Annual Test. 8 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/7/2021 | 11/1/2021 | | 30 | Gas | -- | 0 | No Flow | 492 | 497 | No | None | None | |
| Click for Specifics | Light | 8/9/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 769 | 769 | No | No | No | |
| Click for Specifics | Light | 5/10/2019 | 8/18/2020 | | 25 | | -- | 0 | | 700 | 700 | No | No | No | |
| 401269195 | Form 17 | 3/30/2017 | 4/27/2017 | FLOWING | 410 | GAS | -- | 0 | NO FLOW | 2272 | 2273 | No | -- | -- | Post Production Test. Pressure at start of test was 410 PSI, gas blew down to zero within first 10 minutes of test, no flow through the remainder of the test |
| 401209747 | Form 17 | 1/9/2017 | 2/14/2017 | SHUT-IN | 500 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 401209676 | Form 17 | 12/30/2016 | 2/14/2017 | SHUT-IN | 300 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |