Click for Specifics | Light | 5/11/2024 | 6/18/2024 | | 0 | | -- | 0 | | 346 | 347 | No | No | No | |
Click for Specifics | Light | 5/5/2023 | 6/5/2023 | Plunger Lift | 0 | | -- | 0 | | 330 | 326 | No | No | No | |
Click for Specifics | Light | 3/11/2022 | 4/18/2022 | Flowing | 0 | | -- | 0 | | 303 | 307 | No | No | No | |
Click for Specifics | Light | 2/10/2021 | 2/16/2021 | Flowing | -2 | | -- | 0 | NO FLOW | 407 | 408 | No | No | No | |
Click for Specifics | Light | 1/29/2020 | 2/17/2020 | | -1 | | -- | 0 | No Flow | 495 | 495 | No | No | No | |
Click for Specifics | Light | 3/8/2019 | 12/23/2019 | | 4 | | -- | 0 | No Flow | 637 | 637 | No | No | No | |
401284304 | Form 17 | 5/15/2017 | 5/23/2017 | SHUT-IN | 306 | GAS | -- | 0 | NO FLOW | 957 | 961 | Yes | Yes | No | No fluid on surface casing. Intermediate had 5 min- about 10 gal. of fluid.
Sampled production casing. After blow down surface was:
00: 0 PSI
05: 5 PSI
10: 5 PSI
Intermediate after blow down was:
00: 0 PSI
05: 5 PSI
10: 10 PSI
15: 15 PSI |