|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2025 Measured TD: 12080 ft. Vertical TD: 7490 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/5/2016 | | Proposed Top PZ Location: | Sec:36 Twp: 2N 66W | Footage: 598 FSL 1771 FEL | | Bottom Hole Location: | Sec:36 Twp: 2N 66W | Footage: 460 FNL 1800 FEL | | Proposed Depth/Form: | 12249 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1095 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 137, Top: 0 ft., Bottom: 1095 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7982 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 453, Top: 795 ft., Bottom: 7982 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12249 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 175, Top: 7682 ft., Bottom: 12249 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/16/2014 | | Spud Date: | 6/14/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12080 ft. | Measured PB depth: | 12040 ft. | | True Vertical TD: | 7490 ft. | True Vertical PB depth: | 7490 ft. | | Top PZ Location: | Sec:36 Twp: 2N 66W | Footage: 467 FSL 1729 FEL | | Bottom Hole Location: | Sec:36 Twp: 2N 66W | Footage: 496 FNL 1854 FEL | | Log Types: | CBL, MWD, (Induction 123-39217) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 451, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7581 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 633, Top: 1500 ft., Bottom: 7590 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12069 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 5581 ft., Bottom: 12080 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4535 ft. | | | | | SHANNON | 4835 ft. | | | | | TEEPEE BUTTES | 6631 ft. | | | | | SHARON SPRINGS | 7254 ft. | | | | | NIOBRARA | 7296 ft. | | | | | CODELL | 7755 ft. | | | | | CARLILE | 7796 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 7/21/2017 Interval Top: 7796 ft. Interval Bottom: 8772 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 12/12/2014 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/16/2014 | Treatment End Date: | 9/23/2014 | | Treatment Summary: | 7796-8772’ MD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | No | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7796 ft. | # Of Holes: | 757 | | Interval Bottom: | 8772 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 7/21/2017 Interval Top: 7752 ft. Interval Bottom: 12040 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/12/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/16/2014 | Treatment End Date: | 9/23/2014 | | Treatment Summary: | 7752-7796’ MD; 8772-12040’ MD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | No | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7752 ft. | # Of Holes: | 757 | | Interval Bottom: | 12040 ft. | Hole Size: | |
|
Formation NBCDCL Formation Classification: OW Status: SI - 12/1/2025 Interval Top: 7696 ft. Interval Bottom: 12040 ft.| Completed Information for Formation NIOBRARA-CODELL-CARLILE | | 1st Production Date: | 12/12/2014 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/16/2014 | Treatment End Date: | 9/23/2014 | | Treatment Summary: | Stage 1 - Stage 29 treated with 68,302 bbls of total fluid (slickwater), 385 bbls of additives, and 5,252,946 lbs of 40/70 Sand Proppant | | Total fluid used in treatment (bbls): | 68302 | Max pressure during treatment (psi): | 9386 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 29 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 31043 | Total flowback volume recovered (bbls): | 1170 | | Fresh water used in treatment (bbls): | 36874 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5252946 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7721 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 428 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 428 | | CALC_GOR | 1320 | | CALC_MCF_GAS | 565 | | CASING_PRESS | 2046 | | GRAVITY_OIL | 50 | | MCF_GAS | 565 | | TUBING_PRESS | 1872 |
| | Perforation Data: | | Interval Top: | 7696 ft. | # Of Holes: | 757 | | Interval Bottom: | 12040 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 7/21/2017 Interval Top: 7696 ft. Interval Bottom: 7752 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/12/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/16/2014 | Treatment End Date: | 9/23/2014 | | Treatment Summary: | 7696-7752 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7696 ft. | # Of Holes: | 757 | | Interval Bottom: | 7752 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 417 |
| Total Gas Produced (MCF) | 2064 |
| GOR | 4949 |
| GOR Determination | BOE |
| Average BOE per Day | 2.107 |
| Average MCFE per Day | 12.238 |
| Federal Financial Assurance | i | |
|
|