Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-37363LaSalle
25G-402
PDC ENERGY INC
69175
SI
8/1/2023
WATTENBERG
90750
WELD  123
SWNW 25 5N65W 6
432889
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 929 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404324381Form 177/28/20258/20/2025SHUT-IN137DOWN TO 0 GAS4 WHISPER 621621No----Remediation follow up test. 137 PSI whisper gas blew down to 4 in thirty minutes, whisper gas continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403879613Form 177/30/20248/7/2024SHUT-IN167CONTINUOUS WATER AND GAS13 CONTINUOUS 00No----Annual test. 167 PSI continuous water and gas flow blew down to 13 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy.
403658380Form 171/17/20241/18/2024SHUT-IN140CONTINUOUS WATER AND GAS0 CONTINUOUS 594594No----Abatement system follow up test. 140 PSI continuous gas and water flow blew down to 2 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403480914Form 177/28/20237/31/2023SHUT-IN156CONTINUOUS GAS AND LIQUID HYDROCARBON0 NO FLOW 592592Yes----High Pressure Verification test. 156 PSI gas and fluid blew down to 0 PSI in 45 seconds. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403071151Form 176/7/20226/8/2022PLUNGER LIFT169DOWN TO 0 GAS AND LIQUID HYDROCARBON0 NO FLOW 248248Yes----Automation Alert Follow-up, 169 PSI gas and liquid hydrocarbon flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402789505Form 178/21/20218/24/2021PLUNGER LIFT8WHISPER --0 NO FLOW 589589No----Abatement system follow up test, 8 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402789515Form 1711/20/20208/24/2021PLUNGER LIFT180CONTINUOUS GAS0 NO FLOW 618618Yes----Post-production, 180 PSI gas flow blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
Click for SpecificsLight10/16/202012/3/2020 12 --0No Flow618618NoNoNo 
Click for SpecificsLight9/28/20198/18/2020 0 --0 920920NoNoNo