Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37363
Well Classification: OW Status: SI - 8/1/2023
Well Name/No:LaSalle #25G-402
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2023
FacilityID:432928LocationID:432889
County:WELD #123Location:SWNW 25 5N65W 6
Field:WATTENBERG - #90750Elevation:4640 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1420FNL  245 FWLLat/Long: 40.373550 / -104.620170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.373550 / -104.620130Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/22/2014
End Date: 2/23/2014
Reported: 2/28/2014
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2023             Measured TD: 11435 ft.    Vertical TD: 6920 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/16/2015
Proposed Top PZ Location:Sec:25 Twp: 5N 65W Footage: 2431 FNL  762 FWL
Bottom Hole Location:Sec:25 Twp: 5N 65W Footage: 2412 FNL  501 FEL
Proposed Depth/Form:11466 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7603 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7603 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6276 ft., Depth: 11466 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/10/2014
Spud Date:12/30/2013Spud Date Is:ACTUAL
Measured TD:11435 ft.Measured PB depth:10938 ft.
True Vertical TD:6920 ft.True Vertical PB depth:6918 ft.
Top PZ Location:Sec:25 Twp: 5N 65WFootage: 2431 FNL  762 FWL
Bottom Hole Location:Sec:25 Twp: 5N 65WFootage: 2412 FNL  501 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7363 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 0 ft., Bottom: 7363 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6749 ft., Depth: 10942 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3599 ft.
SUSSEX4115 ft.
SHARON SPRINGS6602 ft.
NIOBRARA6913 ft.
FORT HAYS7413 ft.
CODELL7600 ft.
CARLILE8171 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/20/2019                 Interval Top: 8171 ft.    Interval Bottom: 9518 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/20/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,171'-9,518'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8171 ft.# Of Holes:
Interval Bottom:9518 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/20/2019                 Interval Top: 7600 ft.    Interval Bottom: 11435 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/20/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,600'-8,171' 9,518'-9,888' 9,949'-11,435'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7600 ft.# Of Holes:
Interval Bottom:11435 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/20/2019                 Interval Top: 7413 ft.    Interval Bottom: 9949 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/20/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,413'-7,600' 9,888'-9,949'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7413 ft.# Of Holes:
Interval Bottom:9949 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/20/2019                 Interval Top: 7381 ft.    Interval Bottom: 7413 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/20/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,381'-7,413'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7381 ft.# Of Holes:
Interval Bottom:7413 ft.Hole Size:

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 8/1/2023                  Interval Top: 7381 ft.    Interval Bottom: 11435 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:3/18/2014Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/22/2014Treatment End Date:2/23/2014
Treatment Summary:22 Stage Sliding Sleeve, Swell Packer set at 7,381' Total Fluid: 58,010 bbls Gel Fluid: 39,508 bbls Slickwater Fluid: 18,502 bbls Total Proppant: 2,347,400 lbs Silica Proppant: 2,347,400 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):58010Max pressure during treatment (psi):4018
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.08
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4266
Fresh water used in treatment (bbls):58010Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2347400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7086 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 142
BTU_GAS 1254
CALC_BBLS_H2O 16
CALC_BBLS_OIL 142
CALC_GOR 8458
CALC_MCF_GAS 1201
CASING_PRESS 1414
GRAVITY_OIL 58
MCF_GAS 1201
TUBING_PRESS 1166
Perforation Data:
Interval Top:7381 ft.# Of Holes:
Interval Bottom:11435 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/27/2024
Defined Inactive (SI)YLast Production
07/31/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No