Click for Specifics | Full | 5/1/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 358 | 360 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 6/7/2023 | 6/12/2023 | | 0 | No Flow | -- | 0 | No Flow | 260 | 248 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
402921245 | Form 17 | 1/8/2022 | 1/10/2022 | PLUNGER LIFT | 6 | WHISPER | -- | 0 | NO FLOW | 391 | 391 | No | -- | -- | Abatement system follow up test, 6 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 5/15/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 400 | 400 | No | None | None | |
Click for Specifics | Light | 1/26/2020 | 12/14/2020 | | 2 | | -- | 0 | No Flow | 598 | 598 | No | No | No | |
Click for Specifics | Light | 6/27/2019 | 8/18/2020 | | 0 | | -- | 0 | | 330 | 330 | No | No | No | |