|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/13/2013 Measured TD: 11502 ft. Vertical TD: 7028 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/13/2013 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/12/2015 | Proposed Top PZ Location: | Sec:2 Twp: 2N 64W | Footage: 635 FSL 2517 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 64W | Footage: 485 FNL 2493 FWL | Proposed Depth/Form: | 11428 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7593 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7593 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6279 ft., Depth: 11428 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 8/15/2013 | Spud Date: | 8/5/2013 | Spud Date Is: | ACTUAL | Measured TD: | 11502 ft. | Measured PB depth: | 11494 ft. | True Vertical TD: | 7028 ft. | True Vertical PB depth: | 7028 ft. | Top PZ Location: | Sec:2 Twp: 2N 64W | Footage: 635 FSL 2517 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 64W | Footage: 485 N 2493 W | Log Types: | CBL, MUD | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 931 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 830, Top: 0 ft., Bottom: 931 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7305 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 643, Top: 920 ft., Bottom: 7305 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7165 ft., Depth: 11498 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3793 ft. | | | | SUSSEX | 4296 ft. | | | | SHANNON | 5216 ft. | | | | SHARON SPRINGS | 6638 ft. | | | | NIOBRARA | 6768 ft. | | | | FORT HAYS | 7370 ft. | | | | CODELL | 8536 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/10/2020 Interval Top: 8536 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/10/2020 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 8,536'-11,502' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8536 ft. | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 7370 ft. Interval Bottom: 11502 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 10/3/2013 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/18/2013 | Treatment End Date: | 9/19/2013 | Treatment Summary: | 16 Stage Sliding Sleeve, Swell Packer set at 7,370'
Total Fluid: 60,235 bbls
Gel Fluid: 47,357 bbls
Slickwater Fluid: 12,878 bbls
Total Proppant: 3,591,980 lbs
Silica Proppant: 3,591,980 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 60235 | Max pressure during treatment (psi): | 4108 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 16 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.98 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 6621 | Fresh water used in treatment (bbls): | 60235 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3591980 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7063 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2013 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 311 | BBLS_OIL | 306 | BTU_GAS | 1347 | CALC_BBLS_H2O | 311 | CALC_BBLS_OIL | 306 | CALC_GOR | 1291 | CALC_MCF_GAS | 395 | CASING_PRESS | 1362 | GRAVITY_OIL | 44 | MCF_GAS | 395 | TUBING_PRESS | 980 |
| Perforation Data: | Interval Top: | 7370 ft. | # Of Holes: | | Interval Bottom: | 11502 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 4/10/2020 Interval Top: 7370 ft. Interval Bottom: 8536 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/10/2020 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,370'-8,536' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7370 ft. | # Of Holes: | | Interval Bottom: | 8536 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1141 |
Total Gas Produced (MCF) | 10328 |
GOR | 9051 |
GOR Determination | BOE |
Average BOE per Day | 7.982 |
Average MCFE per Day | 46.301 |
Federal Financial Assurance | i | |
|
|