Click for Specifics | Full | 5/1/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 327 | 348 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 6/7/2023 | 6/12/2023 | | 5 | Down to Zero | -- | 0 | No Flow | 257 | 258 | No | No | No | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
402974580 | Form 17 | 3/4/2022 | 3/7/2022 | PLUNGER LIFT | 8 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 430 | 430 | No | -- | -- | Abatement system follow up test, 8 PSI vapor flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
402758999 | Form 17 | 7/25/2021 | 7/26/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 460 | 470 | No | -- | -- | Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor pressure monthly. |
Click for Specifics | Light | 7/7/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 212 | 212 | No | No | No | |
Click for Specifics | Light | 9/10/2019 | 8/18/2020 | | 0 | | -- | 0 | | 218 | 218 | No | No | No | |