|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2024 Measured TD: 11379 ft. Vertical TD: 7039 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/12/2015 | Proposed Top PZ Location: | Sec:2 Twp: 2N 64W | Footage: 844 FSL 833 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 64W | Footage: 499 FNL 800 FWL | Proposed Depth/Form: | 11424 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7594 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7594 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6283 ft., Depth: 11424 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/25/2013 | Spud Date: | 6/15/2013 | Spud Date Is: | ACTUAL | Measured TD: | 11379 ft. | Measured PB depth: | 11371 ft. | True Vertical TD: | 7039 ft. | True Vertical PB depth: | 7039 ft. | Top PZ Location: | Sec:2 Twp: 2N 64W | Footage: 844 FSL 833 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 64W | Footage: 499 N 800 W | Log Types: | CBL, MUD | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 934 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 840, Top: 0 ft., Bottom: 934 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7379 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 559, Top: 0 ft., Bottom: 7379 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7246 ft., Depth: 11375 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3877 ft. | | | | SUSSEX | 4174 ft. | | | | SHANNON | 5223 ft. | | | | SHARON SPRINGS | 6650 ft. | | | | NIOBRARA | 6774 ft. | | | | FORT HAYS | 7452 ft. | | | | CODELL | 8061 ft. | | | | CARLILE | 9243 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 8/28/2019 Interval Top: 9243 ft. Interval Bottom: 9469 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/28/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 9,243'-9,469' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9243 ft. | # Of Holes: | | Interval Bottom: | 9469 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 8/28/2019 Interval Top: 8061 ft. Interval Bottom: 11379 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/28/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 8,061'-9,243' 9,643'-10,262' 10,886'-11,379' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8061 ft. | # Of Holes: | | Interval Bottom: | 11379 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: SI - 8/1/2024 Interval Top: 7452 ft. Interval Bottom: 11379 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 9/23/2013 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/7/2013 | Treatment End Date: | 9/9/2013 | Treatment Summary: | 16 Stage Sliding Sleeve, Swell Packer set at 7,452'
Total Fluid: 63,591 bbls
Gel Fluid: 47,334 bbls
Slickwater Fluid: 16,257 bbls
Total Proppant: 3,524,570 lbs
Silica Proppant: 3,524,570 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 63591 | Max pressure during treatment (psi): | 4066 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 16 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.95 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7563 | Fresh water used in treatment (bbls): | 63591 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3524570 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7158 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/22/2013 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 89 | BBLS_OIL | 262 | BTU_GAS | 1262 | CALC_BBLS_H2O | 89 | CALC_BBLS_OIL | 262 | CALC_GOR | 1344 | CALC_MCF_GAS | 352 | CASING_PRESS | 1821 | GRAVITY_OIL | 47 | MCF_GAS | 352 | TUBING_PRESS | 681 |
| Perforation Data: | Interval Top: | 7452 ft. | # Of Holes: | | Interval Bottom: | 11379 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 8/28/2019 Interval Top: 7452 ft. Interval Bottom: 10886 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/28/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed depths: 7,452'-8,061' 9,469'-9,643' 10,262'-10,886' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7452 ft. | # Of Holes: | | Interval Bottom: | 10886 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1752 |
Total Gas Produced (MCF) | 12120 |
GOR | 6917 |
GOR Determination | BOE |
Average BOE per Day | 10.466 |
Average MCFE per Day | 60.710 |
Federal Financial Assurance | i | |
|
|