Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-36463BADGER STATE
32C-3HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
12/29/2020
WATTENBERG
90750
WELD  123
NWNW 15 1N68W 6
431161
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1281 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull8/12/20249/11/2024 27ContinuousNone--No Flow599584NoNN Surface Casing produced no liquid.
Click for SpecificsFull10/16/202311/6/2023Plunger Lift17ContinuousNone--No Flow471442NoNN Surface Casing produced no liquid.
Click for SpecificsFull8/8/202211/14/2022Plunger Lift11ContinuousWater--Whisper610600NoNN Surface Casing produced Water. Water insufficient for sampling.
402762860Form 177/23/20217/28/2021 18CONTINUOUS WATER AND GAS1 WHISPER 677665No----Surface Casing produced Water. Water insufficient for sampling.
402714430Form 175/18/20216/10/2021 49CONTINUOUS GAS1 WHISPER 800799No----Surface Casing produced no liquid.
402609347Form 172/24/20212/24/2021 19CONTINUOUS WATER H200 NO FLOW 10451046No----Surface Casing produced Water.
402527080Form 1711/6/202011/6/2020 24CONTINUOUS GAS0 NO FLOW 00No----No Tubing Installed. Casing dead. Surface Casing produced no liquid.
402515847Form 1710/15/202010/21/2020 18CONTINUOUS --0  74--No---- Tubing Shut in. Surface Casing produced no liquid.
402395345Form 175/6/20205/11/2020 100GAS --1 WHISPER 1010No----Tubing Shut in. Surface Casing produced no liquid.
402269214Form 1712/16/201912/20/2019PLUNGER LIFT452GAS --1 WHISPER 00No----SURFACE CASING PRODUCED NO FLUIDS. TUBING SHUT IN
402061360Form 175/14/20195/31/2019PLUNGER LIFT81GAS --1 WHISPER 00No----Surface casing produced no fluids. Blew down extra 30 minutes, ended with Whisper. Shut in for 15 minutes, ended with 7 psi. Tubing shut in. Production casing on Vacuum.