Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36463
Well Classification: OW Status: PR - 12/29/2020
Well Name/No:BADGER STATE #32C-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/29/2020
FacilityID:431180LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5161 ft.
Planned Location:397FNL  773 FWLLat/Long: 40.057330 / -104.996454Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057331 / -104.996454Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/4/2020
End Date: 3/5/2020
Reported: 4/13/2020
Days to report: 39
Disclosure: Sidetrack #00
Start Date: 3/4/2020
End Date: 12/2/2020
Reported: 1/18/2021
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/29/2020             Measured TD: 15953 ft.    Vertical TD: 7917 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/29/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Prop Depth/Form:16313 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1242 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1242 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8290 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 880, Top: 0 ft., Bottom: 8290 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7290 ft., Depth: 16313 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/5/2015
Spud Date:11/2/2014Spud Date Is:ACTUAL
Measured TD:15953 ft.Measured PB depth:15849 ft.
True Vertical TD:7917 ft.True Vertical PB depth:7918 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 152 FNL  346 FWLDepth
Bottom Hole Location:Sec:3 Twp: 1N 68WFootage: 2173 FSL  415 FWLDepth
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1281 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 532, Top: 0 ft., Bottom: 1281 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8269 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 463, Top: 0 ft., Bottom: 8269 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7210 ft., Depth: 15943 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 7210 ft., Bottom: 15953 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4804 ft.
SHARON SPRINGS7589 ft.
NIOBRARA7635 ft.
FORT HAYS8107 ft.
CODELL8201 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/10/2021                Interval Top: 15751 ft.    Interval Bottom: 15817 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:15751-15817
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15751 ft.# Of Holes:456
Interval Bottom:15817 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/10/2021                Interval Top: 13109 ft.    Interval Bottom: 14700 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:13109-14093, 14386-14700
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13109 ft.# Of Holes:456
Interval Bottom:14700 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/10/2021                Interval Top: 12380 ft.    Interval Bottom: 15599 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:12380-13109, 14700-15599
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12380 ft.# Of Holes:456
Interval Bottom:15599 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/6/2021                  Interval Top: 8288 ft.    Interval Bottom: 15751 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:8288-12380, 14093-14386, 15599-15751
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/4/2020Treatment End Date:3/5/2020
Treatment Summary:PERF FROM 14271-15817 119 BBLS 15% HCL ACID, 670 BBLS PUMP DOWN, 30,760 BBLS SLICKWATER, 31,549 BBLS TOTAL FLUID. 863,289 LBS WHITE 30/50 OTTAWA/ST. PETERS, 863,289 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):31549Max pressure during treatment (psi):7653
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):31130Disposition method For flowback:RECYCLE
Total proppant used (lbs):863289Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8288 ft.# Of Holes:456
Interval Bottom:15751 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/29/2020                Interval Top: 8288 ft.    Interval Bottom: 15817 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:12/14/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/4/2020Treatment End Date:12/2/2020
Treatment Summary:PERF FROM 8288-15817 119 BBLS 15% HCL ACID, 286 BBLS 7.5% HCL ACID, 1,594 BBLS BIO WATER, 4,688 BBLS PUMP DOWN, 138,540 BBLS SLICKWATER, 145,227 BBLS TOTAL FLUID. 4,160,877 LBS WHITE 30/50 OTTAWA/ST. PETERS, 4,160,877 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):145227Max pressure during treatment (psi):7813
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):405Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):9862
Fresh water used in treatment (bbls):144522Disposition method For flowback:RECYCLE
Total proppant used (lbs):4160877Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7877 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/29/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 352
BBLS_OIL 239
BTU_GAS 1279
CALC_BBLS_H2O 352
CALC_BBLS_OIL 239
CALC_GOR 2531
CALC_MCF_GAS 605
CASING_PRESS 2400
GRAVITY_OIL 47
MCF_GAS 605
TUBING_PRESS 1300
Perforation Data:
Interval Top:8288 ft.# Of Holes:456
Interval Bottom:15817 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)12156
Total Gas Produced (MCF)71774
GOR5904
GOR DeterminationBOE
Average BOE per Day66.989
Average MCFE per Day388.531

 Federal Financial Assurance  i 

 Tribal Well  i No