Click for Specifics | Full | 1/22/2024 | 2/12/2024 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 405 | 405 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 6/30/2023 | 7/17/2023 | Plunger Lift | 1 | Whisper | None | -- | Whisper | 409 | 409 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 8/8/2022 | 11/14/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 408 | 408 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 9/2/2021 | 10/18/2021 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 447 | 447 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 8/28/2020 | 11/2/2020 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 524 | 524 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 9/26/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 590 | 590 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
400842395 | Form 17 | 5/18/2015 | 5/21/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 451 | 459 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD-UP, DEAD. INITIAL POST REMEDIATION BLOW DOWN ON 5-12-15 STARTED WITH A WHISPER AND BLEW DOWN TO ZERO PSI. |
400733048 | Form 17 | 10/17/2014 | 11/17/2014 | PLUNGER LIFT | 278 | GAS | -- | 11 | GAS | 379 | 389 | No | -- | -- | SC DID NOT PRODUCED ANY FLUID, 30 MIN BLOWDOWN, WHIPSER, 15 MIN BUILD UP, 3 |