|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 8810 ft. Vertical TD: 8423 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/19/2013 | Proposed Top PZ Location: | Sec:14 Twp: 1N 68W | Footage: 1340 FSL 2589 FWL | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 1336 FSL 2599 FWL | Proposed Depth/Form: | 8825 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1160 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 812, Top: 0 ft., Bottom: 1160 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8825 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8825 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/17/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8810 ft. | Measured PB depth: | 8785 ft. | True Vertical TD: | 8423 ft. | True Vertical PB depth: | 8398 ft. | Top PZ Location: | Sec:14 Twp: 1N 68W | Footage: 1340 FSL 2589 FWL | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 1336 S 2599 W | Log Types: | PRE FORM 5 | Log Types: | P/E AILC-CNLD-ML-CV; CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1190 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 790, Top: 0 ft., Bottom: 1190 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8802 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 7304 ft., Bottom: 8802 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 2382 ft., Depth: 6234 ft., Bottom: 6253 ft., Sacks: 760, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 823 ft., Depth: 1452 ft., Bottom: 1479 ft., Sacks: 78, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4570 ft. | 4820 ft. | | | SUSSEX | 5024 ft. | 5265 ft. | | | SHANNON | 5635 ft. | 5735 ft. | | | NIOBRARA | 7872 ft. | | | | FORT HAYS | 8226 ft. | | | | CODELL | 8248 ft. | | | | J SAND | 8675 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 4/1/2017 Interval Top: 8696 ft. Interval Bottom: 8720 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/5/2011 | Treatment Summary: | J S PERF 8696-8720 HOLES 48 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 145,404 gal Slickwater w/ 116,720# 40/70, 4,000# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8696 ft. | # Of Holes: | 48 | Interval Bottom: | 8720 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/29/2011 Interval Top: 7872 ft. Interval Bottom: 8720 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/5/2011 | Treatment Summary: | NB PERF 7872-8112 HOLES 52 SIZE 0.42
CD PERF 8250-8270 HOLES 60 SIZE 0.42
J S PERF 8696-8720 HOLES 48 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/29/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1246 | CALC_BBLS_OIL | 1 | CALC_GOR | 1000 | CALC_MCF_GAS | 1 | CASING_PRESS | 1235 | GRAVITY_OIL | 48 | MCF_GAS | 1 |
| Perforation Data: | Interval Top: | 7872 ft. | # Of Holes: | 160 | Interval Bottom: | 8720 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2021 Interval Top: 7872 ft. Interval Bottom: 8270 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2011 | Treatment Summary: | NB PERF 7872-8112 HOLES 52 SIZE 0.42 CD PERF 8250-8270 HOLES 60 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 223 gal 15% HCl & 243,760 gal Slickwater w/ 200,320# 40/70
Frac Codell down 4-1/2" Csg w/ 195,791 gal Slickwater w/ 150,880# 40/70 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7872 ft. | # Of Holes: | 112 | Interval Bottom: | 8270 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2021 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|