Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-32494Binder
21-10DU
PDC ENERGY INC
69175
TA
1/7/2026
WATTENBERG
90750
WELD  123
SWNW 10 4N67W 6
319109
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 452 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404466186Form 1712/3/202512/9/2025SHUT-IN63CONTINUOUS GAS0 NO FLOW 00No---- 
404454876Form 1711/20/202512/1/2025SHUT-IN35WHISPER GAS0 WHISPER 600600No---- 
404204601Form 175/2/20255/14/2025SHUT-IN67DOWN TO 0 GAS0 NO FLOW 00No----Annual Test. 67 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404020478Form 1711/27/202412/9/2024SHUT-IN49CONTINUOUS GAS0 NO FLOW 665665No----Remediation follow up test. 49 PSI blew down to 0 PSI within first five minutes of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/26/20243/19/2024Shut In0Down to Zero--0Down to Zero625625NoNoNoAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy.
403585249Form 1711/3/202311/6/2023SHUT-IN1DOWN TO 0 GAS0 NO FLOW 600600No----Pre-P&A. 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test.
403407612Form 175/17/20235/19/2023SHUT-IN58CONTINUOUS WATER AND GAS0 NO FLOW 642642Yes----High Pressure Alert Confirmation. 58 PSI gas and water flow blew down to 0 PSI in 5 minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403365783Form 173/20/20234/5/2023SHUT-IN36CONTINUOUS WATER AND GAS0 DOWN TO 0 555555No----Annual Test. 36 PSI blew down to 0 PSI within first few seconds of test. Continuous water and gas were observed the first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
403174383Form 179/21/20229/22/2022PLUNGER LIFT44CONTINUOUS WATER AND GAS0 NO FLOW 630508No----Abatement system follow up test. 44 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. Sample collected 5/24/2022. See doc# 403008701 for Wellbore Diagram.
403008694Form 174/7/20224/8/2022SHUT-IN93CONTINUOUS GAS0 WHISPER 620620Yes----Annual Test, 93 PSI continuous whisper gas blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402898207Form 1710/20/202112/14/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 463463No----Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly.
402422242Form 173/5/20206/15/2020 0WHISPER --0 NO FLOW 381391No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402073137Form 173/30/20196/12/2019PLUNGER LIFT54NO FLOW --0 NO FLOW 528533No----Annual Test 54 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.