| 404466186 | Form 17 | 12/3/2025 | 12/9/2025 | SHUT-IN | 63 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 404454876 | Form 17 | 11/20/2025 | 12/1/2025 | SHUT-IN | 35 | WHISPER | GAS | 0 | WHISPER | 600 | 600 | No | -- | -- | |
| 404204601 | Form 17 | 5/2/2025 | 5/14/2025 | SHUT-IN | 67 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Annual Test. 67 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404020478 | Form 17 | 11/27/2024 | 12/9/2024 | SHUT-IN | 49 | CONTINUOUS | GAS | 0 | NO FLOW | 665 | 665 | No | -- | -- | Remediation follow up test. 49 PSI blew down to 0 PSI within first five minutes of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/26/2024 | 3/19/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 625 | 625 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403585249 | Form 17 | 11/3/2023 | 11/6/2023 | SHUT-IN | 1 | DOWN TO 0 | GAS | 0 | NO FLOW | 600 | 600 | No | -- | -- | Pre-P&A. 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. |
| 403407612 | Form 17 | 5/17/2023 | 5/19/2023 | SHUT-IN | 58 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 642 | 642 | Yes | -- | -- | High Pressure Alert Confirmation. 58 PSI gas and water flow blew down to 0 PSI in 5 minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403365783 | Form 17 | 3/20/2023 | 4/5/2023 | SHUT-IN | 36 | CONTINUOUS | WATER AND GAS | 0 | DOWN TO 0 | 555 | 555 | No | -- | -- | Annual Test. 36 PSI blew down to 0 PSI within first few seconds of test. Continuous water and gas were observed the first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 403174383 | Form 17 | 9/21/2022 | 9/22/2022 | PLUNGER LIFT | 44 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 630 | 508 | No | -- | -- | Abatement system follow up test. 44 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. Sample collected 5/24/2022. See doc# 403008701 for Wellbore Diagram. |
| 403008694 | Form 17 | 4/7/2022 | 4/8/2022 | SHUT-IN | 93 | CONTINUOUS | GAS | 0 | WHISPER | 620 | 620 | Yes | -- | -- | Annual Test, 93 PSI continuous whisper gas blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402898207 | Form 17 | 10/20/2021 | 12/14/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 463 | 463 | No | -- | -- | Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly. |
| 402422242 | Form 17 | 3/5/2020 | 6/15/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 381 | 391 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402073137 | Form 17 | 3/30/2019 | 6/12/2019 | PLUNGER LIFT | 54 | NO FLOW | -- | 0 | NO FLOW | 528 | 533 | No | -- | -- | Annual Test 54 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |