|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 1/7/2026 Measured TD: 7660 ft. Vertical TD: 7319 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 1/7/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/30/2012 | | Proposed Top PZ Location: | Sec:10 Twp: 4N 67W | Footage: 633 FNL 1829 FWL | | Bottom Hole Location: | Sec:10 Twp: 4N 67W | Footage: 627 FNL 1814 FWL | | Proposed Depth/Form: | 7740 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-745 , Unit Acreage: 80, Drill Unit: N2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7740 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 525, Top: 0 ft., Bottom: 7740 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/14/2011 | | Spud Date: | 1/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7660 ft. | Measured PB depth: | 7596 ft. | | True Vertical TD: | 7319 ft. | True Vertical PB depth: | 7254 ft. | | Top PZ Location: | Sec:10 Twp: 4N 67W | Footage: 633 FNL 1829 FWL | | Bottom Hole Location: | Sec:10 Twp: 4N 67W | Footage: 627 FNL 1814 FWL | | Log Types: | CBL, CNL/CDL/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 452 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7638 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1030, Top: 0 ft., Bottom: 7638 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7202 ft. | | | | | FORT HAYS | 7472 ft. | | | | | CODELL | 7493 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 1/7/2026 Interval Top: 7495 ft. Interval Bottom: 7503 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/26/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/8/2011 | | Treatment Summary: | Frac'd Codell with 477 bbls of slickwater pad, 143 bbls of 22# pHaser pad, 1934 bbls of 22# pHaser fluid system, 217760# of 20/40 Prefrd Rock and 8000# of SB Excel 20/40 resin coated proppant. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7495 ft. | # Of Holes: | 24 | | Interval Bottom: | 7503 ft. | Hole Size: | 0.36 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 1/7/2026 Interval Top: 7211 ft. Interval Bottom: 7503 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/26/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 23 | | BTU_GAS | 1303 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 4174 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 787 | | GRAVITY_OIL | 52 | | MCF_GAS | 96 |
| | Perforation Data: | | Interval Top: | 7211 ft. | # Of Holes: | 52 | | Interval Bottom: | 7503 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/7/2026 Interval Top: 7211 ft. Interval Bottom: 7280 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/26/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/8/2011 | | Treatment Summary: | Perf'd Niobrara "A" 7211-13' (4 holes), Niobrara "B" 7272-80' (24 holes), Frac'd Niobrara w/ 119 bbl FE-1A Pad, 1548 bbls Slickwater pad, 144 20# bbls of pHaser pad, 2248 bbls 20# pHaser fluid system, 238980# 20/40 Prefrd Rock and 12000# of SB Excel 20/40 resin coated proppant. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7211 ft. | # Of Holes: | 28 | | Interval Bottom: | 7280 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 05/17/2025 |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|