| 404594999 | Form 17 | 3/23/2026 | 3/25/2026 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
| Click for Specifics | Full | 3/3/2026 | 3/9/2026 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 2/16/2025 | 3/4/2025 | | 0 | | -- | 0 | | 2 | 2 | No | No | No | |
| Click for Specifics | Full | 3/22/2024 | 4/3/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/12/2023 | 4/24/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/1/2022 | 3/14/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | None | None | |
| Click for Specifics | Full | 4/23/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | |
| Click for Specifics | Light | 4/15/2020 | 12/14/2020 | | 0 | | -- | 0 | No Flow | 350 | 350 | No | No | No | |
| Click for Specifics | Light | 4/15/2019 | 8/18/2020 | | 0 | | -- | 0 | | 700 | 700 | No | No | No | |