|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 4/1/2020 Measured TD: 7737 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 4/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 9/7/2012 | | Proposed Depth/Form: | 7743 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 pds , Citings Type: PLANNED | | Cement: | Sacks: 243, Top: 0 ft., Bottom: 540 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7743 ft., Weight: 11.6 pds , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 6588 ft., Bottom: 7743 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/30/2010 | | Spud Date: | 12/21/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7737 ft. | Measured PB depth: | 7700 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | TRIPLE-COMBO, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 561 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 561 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7727 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 3730 ft., Bottom: 7727 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3707 ft. | 3885 ft. | | | | SUSSEX | 4107 ft. | 4207 ft. | | | | SHANNON | 4387 ft. | 4432 ft. | | | | NIOBRARA | 6800 ft. | 7050 ft. | | | | FORT HAYS | 7050 ft. | 7099 ft. | | | | CODELL | 7099 ft. | 7119 ft. | | | | J SAND | 7562 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 6/23/2020 Interval Top: 7566 ft. Interval Bottom: 7594 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2011 | | Treatment Summary: | FRACTURE STIMULATED J-SAND DOWN CASING WITH 109,864 GAL. HYBRID DYNAFLOW-2WR AND 200,200# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 2 | | BTU_GAS | 1296 | | CALC_GOR | 2250 | | CASING_PRESS | 1335 | | GRAVITY_OIL | 52 | | MCF_GAS | 45 | | TUBING_PRESS | 1325 |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 112 | | Interval Bottom: | 7594 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: AB - 6/23/2020 Interval Top: 7101 ft. Interval Bottom: 7117 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/26/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | 209,370 gals FR water,142,548 gals SLF, 150,660lbs 30/50 White |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 68 | | BTU_GAS | 1224 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 136 | | CALC_GOR | 1368 | | CALC_MCF_GAS | 186 | | CASING_PRESS | 1450 | | GRAVITY_OIL | 49 | | MCF_GAS | 93 |
| | Perforation Data: | | Interval Top: | 7101 ft. | # Of Holes: | 64 | | Interval Bottom: | 7117 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/08/2022 |
| Defined Inactive (SI ) | Y | Defined Inactive 01/31/2018 |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|