Click for Specifics | Full | 3/13/2024 | 6/18/2024 | | 1 | Whisper | None | -- | No Flow | 943 | 942 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 2/22/2023 | 3/8/2023 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 984 | 983 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 4/5/2022 | 5/16/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 1010 | 1010 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 4/22/2021 | 5/17/2021 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 1046 | 1043 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 2/20/2020 | 6/8/2020 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 1069 | 1069 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
Click for Specifics | Full | 2/12/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 1084 | 1084 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
400819321 | Form 17 | 3/26/2015 | 4/2/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1547 | 1545 | No | -- | -- | SURFACE CASING DID NOT PRODUCE ANY FLUID. 15 MINUTE BUILD-UP, WHISPER. TORN APART AND SHUT-IN FOR HZ PREP. UPON ARRIVAL. |