|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 11/1/2020 Measured TD: 8500 ft. Vertical TD: 8174 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 11/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/21/2012 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 50 FSL 50 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 50 FSL 50 FWL | | Proposed Depth/Form: | 8133 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1140 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 777, Top: 0 ft., Bottom: 1140 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8133 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8133 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/9/2011 | | Spud Date: | 5/4/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8500 ft. | Measured PB depth: | 8337 ft. | | True Vertical TD: | 8174 ft. | True Vertical PB depth: | 8011 ft. | | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 45 FSL 46 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 49 FSL 51 FWL | | Log Types: | AI-D/N-GR, SD-DSN-GR, AI-GR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1172 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 1172 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8378 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6672 ft., Bottom: 8378 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1060 ft., Depth: 5270 ft., Bottom: 5270 ft., Sacks: 620, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4590 ft. | 4636 ft. | | | | SUSSEX | 4911 ft. | 5208 ft. | | | | NIOBRARA | 7586 ft. | | | | | FORT HAYS | 7864 ft. | | | | | CODELL | 7884 ft. | | | | | J SAND | 8349 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 11/1/2020 Interval Top: 8342 ft. Interval Bottom: 8372 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | J S PERF 8342-8372 TOTAL 48 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 149,096 gal Slickwater w/ 115,460# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8342 ft. | # Of Holes: | 48 | | Interval Bottom: | 8372 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 9/8/2011 Interval Top: 7678 ft. Interval Bottom: 8372 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | NB PERF 7678-7752 TOTAL 62 SIZE 0.42
CD PERF 7892-7906 TOTAL 56 SIZE 0.42
J S PERF 8342-8372 TOTAL 48 SIZE 0.38 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8307 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 35 | | BTU_GAS | 1262 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 2857 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 47 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7678 ft. | # Of Holes: | 166 | | Interval Bottom: | 8372 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 11/1/2020 Interval Top: 7678 ft. Interval Bottom: 7906 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/31/2011 | | Treatment Summary: | NB PERF 7678-7752 TOTAL 62 SIZE 0.42 CD PERF 7892-7906 TOTAL 56 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,931 gal Slickwater w/ 200,520# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 209,880 gal Slickwater w/ 150,080# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7678 ft. | # Of Holes: | 118 | | Interval Bottom: | 7906 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/31/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|