| 403012054 | Form 17 | 4/11/2022 | 4/12/2022 | SHUT-IN | 93 | CONTINUOUS | GAS | 0 | WHISPER | 620 | 620 | No | -- | -- | Pre P&A, 93 PSI continuous whisper gas blew down to 0 PSI within thirty minutes. A sample was recently collected on 02/16/2022. |
| 402934750 | Form 17 | 1/23/2022 | 1/24/2022 | PLUNGER LIFT | 112 | DOWN TO 0 | GAS | 0 | NO FLOW | 550 | 550 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 112 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402898195 | Form 17 | 11/30/2021 | 12/14/2021 | PLUNGER LIFT | 2 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 500 | 500 | No | -- | -- | Engineering Ad Hoc test, 2 PSI water flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Light | 11/6/2020 | 12/14/2020 | | 0 | | -- | 0 | | 275 | 275 | No | No | No | |
| 402422199 | Form 17 | 3/5/2020 | 6/15/2020 | | 3 | WHISPER | -- | 0 | WHISPER | 582 | 584 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402073150 | Form 17 | 4/7/2019 | 6/12/2019 | PLUNGER LIFT | 240 | NO FLOW | -- | 0 | NO FLOW | 590 | 544 | No | -- | -- | Annual Test 240 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |