Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31519
Well Classification: OW Status: PA - 7/29/2022
Well Name/No:Binder #12-10DU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/29/2022
FacilityID:416940LocationID:319109
County:WELD #123Location:SWNW 10 4N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1786FNL  359 FWLLat/Long: 40.329350 / -104.885350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.329338 / -104.885326Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/29/2022             Measured TD: 7360 ft.    Vertical TD: 7313 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/29/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/29/2012
Proposed Top PZ Location:Sec:10 Twp: 4N 67W Footage: 2162 FNL  753 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67W Footage: 2170 FNL  749 FWL
Proposed Depth/Form:7453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-745 , Unit Acreage: 80, Drill Unit: S/2NW4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 80, Drill Unit: S/2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 420 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 420 ft.
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7453 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 5000 ft., Bottom: 7453 ft.

Wellbore Completed
Completion Date:1/3/2011
Spud Date:12/30/2010Spud Date Is:ACTUAL
Measured TD:7360 ft.Measured PB depth:7318 ft.
True Vertical TD:7313 ft.True Vertical PB depth:7271 ft.
Top PZ Location:Sec:10 Twp: 4N 67WFootage: 2162 FNL  753 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67WFootage: 2170 FNL  749 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 469 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 469 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7336 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 0 ft., Bottom: 7360 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4049 ft.
SHANNON4609 ft.
NIOBRARA6837 ft.
FORT HAYS7163 ft.
CODELL7184 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 7186 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/10/2011
Treatment Summary:Frac'd Codell with 476 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 1972 bbls of pHaser 22# fluid system, 217000# of 20/40 Preferd Rock and 8000# of SB Excel 20/40.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7186 ft.# Of Holes:24
Interval Bottom:7194 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/29/2022                 Interval Top: 6893 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/26/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 28
BTU_GAS 1236
CALC_BBLS_H2O 25
CALC_BBLS_OIL 28
CALC_GOR 4752
CALC_MCF_GAS 131
CASING_PRESS 616
GRAVITY_OIL 51
MCF_GAS 131
Perforation Data:
Interval Top:6893 ft.# Of Holes:52
Interval Bottom:7194 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 6893 ft.    Interval Bottom: 7008 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/10/2011
Treatment Summary:Perf'd Niobrara "A"6893-6895' (4 holes), Niobrara "B" 7000-7008' (24 holes), Frac'd Niobrara with 119 bbls of FE-1A Pad, 1548 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2258 bbls of pHaser 20# fluid system, 238300# 20/40 Preferd Rock, 12000# 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6893 ft.# Of Holes:28
Interval Bottom:7008 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/29/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No