| 402878496 | Form 17 | 11/22/2021 | 11/23/2021 | SHUT-IN | 21 | DOWN TO 0 | GAS | 0 | NO FLOW | 790 | 790 | No | -- | -- | Pre P&A, 21 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. |
| Click for Specifics | Full | 5/26/2021 | 11/1/2021 | | 24 | Whisper (very low flow) | -- | 0 | Whisper (very low flow) | 725 | 725 | No | None | None | |
| 402610699 | Form 17 | 10/16/2020 | 2/25/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 720 | 720 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 7/5/2020 | 12/3/2020 | | 38 | | -- | 0 | No Flow | 691 | 691 | No | No | No | |
| 402242411 | Form 17 | 11/8/2019 | 11/18/2019 | PLUNGER LIFT | 20 | SURGE | -- | 0 | CONTINUOUS | 540 | 545 | Yes | -- | Yes | Annual bradenhead testing. Bradenhead surged fluid and continued to flow during test. Bradenhead will be sampled and results to be uploaded into EDD when available. |