|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/8/2022 Measured TD: 7466 ft. Vertical TD: 7265 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/8/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/5/2012 | | Proposed Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 2553 FNL 1336 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 2548 FNL 1332 FEL | | Proposed Depth/Form: | 7459 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7459 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 689, Top: , Bottom: 7459 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/5/2010 | | Spud Date: | 12/1/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7466 ft. | Measured PB depth: | 7394 ft. | | True Vertical TD: | 7265 ft. | True Vertical PB depth: | 7195 ft. | | Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 2553 FNL 1336 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 2548 FNL 1332 FEL | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 580 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 476, Top: 0 ft., Bottom: 580 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7450 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 2250 ft., Bottom: 7450 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6953 ft. | | | | | CODELL | 7277 ft. | | | | | GREENHORN | 7361 ft. | | | | | FORT HAYS | 7416 ft. | | | |
Formation CODL Formation Classification: Status: CM - 4/1/2020 Interval Top: 7278 ft. Interval Bottom: 7293 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7278 ft. | # Of Holes: | 60 | | Interval Bottom: | 7293 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/8/2022 Interval Top: 6970 ft. Interval Bottom: 7293 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/12/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/11/2011 | | Treatment Summary: | Codell & Niobrara are commingled; the Codell is producing through a compostie flow through plug
Codell 7278'-7293', 60 holes, .41"
Frac'd Codell w/133678 gals Silverstim, Acid, and Slick Water with 270000 lbs Ottawa sand
Niobrara 6970'-7109', 48 holes, .73"
Frac'd Niobrara w/170816 gals Silverstim and Slick Water with 249000 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/21/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 18 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 14722 | | CALC_MCF_GAS | 265 | | CASING_PRESS | 325 | | GRAVITY_OIL | 60 | | MCF_GAS | 265 |
| | Perforation Data: | | Interval Top: | 6970 ft. | # Of Holes: | 108 | | Interval Bottom: | 7293 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 4/1/2020 Interval Top: 6970 ft. Interval Bottom: 7109 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6970 ft. | # Of Holes: | 48 | | Interval Bottom: | 7109 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/08/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|