| 404303157 | Form 17 | 7/15/2025 | 8/1/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 390 | 390 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
| Click for Specifics | Light | 1/24/2025 | 2/3/2025 | | 0 | | -- | 0 | | 820 | 820 | No | No | No | |
| Click for Specifics | Full | 1/10/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 471 | 471 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/7/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 358 | 361 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/26/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 433 | 433 | No | None | None | |
| Click for Specifics | Full | 6/8/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 452 | 452 | No | None | None | |
| Click for Specifics | Light | 11/6/2020 | 12/14/2020 | | 0 | | -- | 0 | No Flow | 350 | 350 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 440 | 440 | No | No | No | |
| 400416513 | Form 17 | 4/24/2013 | 5/10/2013 | PLUNGER LIFT | 10 | GAS | -- | 0 | DOWN TO 0 | 350 | 358 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |