|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/28/2025 Measured TD: 8030 ft. Vertical TD: 7094 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/28/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/9/2012 | | Proposed Top PZ Location: | Sec:1 Twp: 4N 67W | Footage: 1301 FNL 1072 FWL | | Bottom Hole Location: | Sec:1 Twp: 4N 67W | Footage: 1317 FNL 1079 FWL | | Proposed Depth/Form: | 7959 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 5.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7959 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7959 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/8/2010 | | Spud Date: | 6/5/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8030 ft. | Measured PB depth: | 7982 ft. | | True Vertical TD: | 7094 ft. | True Vertical PB depth: | 7856 ft. | | Top PZ Location: | Sec:1 Twp: 4N 67W | Footage: 1301 FNL 1072 FWL | | Bottom Hole Location: | Sec:1 Twp: 4N 67W | Footage: 1317 FNL 1079 FWL | | Log Types: | | | Log Types: | PE/AILC-CNDL-ML, GR-CCL-CB-VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 884 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 884 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8019 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 960, Top: 800 ft., Bottom: 8019 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2672 ft. | | | | | PARKMAN | 3807 ft. | | | | | SUSSEX | 4313 ft. | | | | | SHANNON | 4872 ft. | | | | | NIOBRARA | 7107 ft. | | | | | FORT HAYS | 7392 ft. | | | | | CODELL | 7412 ft. | | | | | J SAND | 7867 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/28/2025 Interval Top: 7868 ft. Interval Bottom: 7902 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/20/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/19/2010 | | Treatment Summary: | Frac JSND w/ 153,309 gal SW & 115,020# 40/70 sand & 4,000# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/25/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 21 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 8476 | | CALC_MCF_GAS | 178 | | CASING_PRESS | 2475 | | GRAVITY_OIL | 56 | | MCF_GAS | 178 |
| | Perforation Data: | | Interval Top: | 7868 ft. | # Of Holes: | 72 | | Interval Bottom: | 7902 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2025 Interval Top: 7116 ft. Interval Bottom: 7434 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/20/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/26/2010 | | Treatment Summary: | NBRR Perf 7116-7294 Holes 62 Size 0.42 CODL Perf 7414-7434 Holes 60 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 243,014 gal SW & 200,040# 40/70 sand & 4,000# SB Excel.
Frac CODL w/ 201,311 gal SW & 150,000# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/25/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 21 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 8524 | | CALC_MCF_GAS | 179 | | CASING_PRESS | 2475 | | GRAVITY_OIL | 56 | | MCF_GAS | 179 |
| | Perforation Data: | | Interval Top: | 7116 ft. | # Of Holes: | 122 | | Interval Bottom: | 7434 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/28/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 250 |
| Total Gas Produced (MCF) | 4804 |
| GOR | 19216 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.945 |
| Average MCFE per Day | 17.068 |
| Federal Financial Assurance | i | |
|
|